Gary Ng
- Listed as
- architect, authorized agent-others
- Firm
- Fractured9
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Dec 2017
11 permits since 2000 (architect on 10 permits, authorized agent-others on 1 permit): 7 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 20, 2017 | Completed final sign-off Aug 2019 | 58 Lapidge St | Green City Construction Inc | move (e) deck landing to south side of rear property line.Details
move (e) deck landing to south side of rear property line. | $20,000 |
| Nov 9, 2017 | Completed final sign-off Mar 2019 | 35 Riverton Dr | A Plus Builders | remodel existing bathroom, (e) kitchen on 2nd fl. add new powder room and full bathroom on 2nd fl. move (e) bathroom on 1st fl. add new laundry room, family room, & enclose part of existing foyer to 1st & 2nd fl.Details
remodel existing bathroom, (e) kitchen on 2nd fl. add new powder room and full bathroom on 2nd fl. move (e) bathroom on 1st fl. add new laundry room, family room, & enclose part of existing foyer to 1st & 2nd fl. | $80,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2024 | 830 Olmstead St | Kieran O'carroll Construction | remodel (e) house. expand 1st flr, add 2nd flr (vertical add) w/ master suite, bath & walk in closet. remodel (e) detached garage - expand to include family rm @ rear & add 2nd flr (vertical add) bedroom, bathroom & closet. add passage way connecting garage structure to main house @ 2nd flr.Details
remodel (e) house. expand 1st flr, add 2nd flr (vertical add) w/ master suite, bath & walk in closet. remodel (e) detached garage - expand to include family rm @ rear & add 2nd flr (vertical add) bedroom, bathroom & closet. add passage way connecting garage structure to main house @ 2nd flr. | $280,000 |
| Oct 2, 2015 | Never finaled issued Sep 2016, no final | 844 Duncan St | Green City Construction Inc | vertical addition to (e) bldg including bathroom. renovation & seismic retrofit to (e) structure & addition of 1-level with 1,000 sf of living space.Details
vertical addition to (e) bldg including bathroom. renovation & seismic retrofit to (e) structure & addition of 1-level with 1,000 sf of living space. | $575,000 |
| Dec 3, 2013 | Completed final sign-off Aug 2014 | 2040 Broadway | Rhodes Construction Inc. | unit #402 - replace roof deck in kind, remodel bathroom, replace fau, add recessed ceiling lights. at roof deck, no privacy screens shall be provided.Details
unit #402 - replace roof deck in kind, remodel bathroom, replace fau, add recessed ceiling lights. at roof deck, no privacy screens shall be provided. | $88,000 |
| Jan 25, 2011 | Completed final sign-off May 2013 | 33 Mallorca Wy | City Homes Construction Inc, Green City Construction Inc | 4th floor addition to existing 3-story residence located on 33 mallorca way.Details
4th floor addition to existing 3-story residence located on 33 mallorca way. | $95,000 |
| Dec 11, 2007 | Never finaled issued Dec 2007, no final | 309 Clement St | levelling of entrance, replacementof entry door & upgrade existing bathroom to meet handicap access. no change to exterior facade & wall.Details
levelling of entrance, replacementof entry door & upgrade existing bathroom to meet handicap access. no change to exterior facade & wall. | $6,500 | |
| Aug 13, 2007 | Expired or cancelled cancelled Feb 2018 | 1316 Bowdoin St | to erect a new 3-story single family dwelling unit.Details
to erect a new 3-story single family dwelling unit. | $185,000 | |
| Jul 21, 2005 | Never finaled issued Jul 2005, no final | 1340 Clay St | replace (e) roll up garage doors w/filt up garage doors. replace in kind. three doors-same sizeDetails
replace (e) roll up garage doors w/filt up garage doors. replace in kind. three doors-same size | $22,000 | |
| Feb 2, 2005 | Completed final sign-off Nov 2005 | 1313 06th Av | remodel existing kitchen, add a skylight to top floor unitDetails
remodel existing kitchen, add a skylight to top floor unit | $36,000 | |
| Feb 2, 2005 | Completed final sign-off Apr 2006 | 163 Valley St | remodel existing kitchen & bathrm on 2nd floorDetails
remodel existing kitchen & bathrm on 2nd floor | $13,500 |