Parviz Emami
- Listed as
- authorized agent-others, contractor
- Firm
- Modern Construction Design
- Based in
- Santa Clara
- On San Francisco permits
- Aug 2018 to Jan 2022
10 permits since 2000 (contractor on 10 permits, authorized agent-others on 2 permits): 4 completed, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 7, 2022 | Completed final sign-off May 2022 | 112 Putnam St | Modern Construction Design | revision to permit #202106283351, #202109148395, #202110080106 repair the front section of foundation in kind.replace extg windows in kind, remove window at lobby, replace front and rear wall stucco in kind.Details
revision to permit #202106283351, #202109148395, #202110080106 repair the front section of foundation in kind.replace extg windows in kind, remove window at lobby, replace front and rear wall stucco in kind. | |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 112 Putnam St | Modern Construction Design | revision to 2021 0628 3351 & 2021 0914 8395. 1st/ fl retaining wall, excavation to provide 8 ft ceiling height, (n) exterior construction stairs rf. roof hatch change to slide open. hand railing changes accordingly.Details
revision to 2021 0628 3351 & 2021 0914 8395. 1st/ fl retaining wall, excavation to provide 8 ft ceiling height, (n) exterior construction stairs rf. roof hatch change to slide open. hand railing changes accordingly. | $30,000 |
| Sep 14, 2021 | Completed final sign-off May 2022 | 112 Putnam St | Modern Construction Design | rev to pp# 2010628351; 1fl. relocate master bathroom with closet and bath, remove family room and add an new bath room, relocate 2nd bathroom 2nd fl: remove a bedroom and relocate the kitchen to make dining area bigger, remodel the other bedroom and bath, relocate skylightDetails
rev to pp# 2010628351; 1fl. relocate master bathroom with closet and bath, remove family room and add an new bath room, relocate 2nd bathroom 2nd fl: remove a bedroom and relocate the kitchen to make dining area bigger, remodel the other bedroom and bath, relocate skylight | |
| Jun 28, 2021 | Never finaled issued Sep 2021, no final | 112 Putnam St | Modern Construction Design | 1/f: remodel (1) bedroom, relocate (1) bathroom, add (1) new bedroom, (2) new baths, add office & family room. 2/f: remodel kitchen & (1) bath, add (1) new bathroom, remodel (1) bedroom & living area. add new roof deck w/new stairs.Details
1/f: remodel (1) bedroom, relocate (1) bathroom, add (1) new bedroom, (2) new baths, add office & family room. 2/f: remodel kitchen & (1) bath, add (1) new bathroom, remodel (1) bedroom & living area. add new roof deck w/new stairs. | $200,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 1767 43rd Av | Modern Construction Design | interior remodel at ground floor and 2nd floor. new rear yard wood deck. ground floor: new bathroom, closet and laundry. 2nd floor: new kitchen and wood deckDetails
interior remodel at ground floor and 2nd floor. new rear yard wood deck. ground floor: new bathroom, closet and laundry. 2nd floor: new kitchen and wood deck | $75,000 |
| Jul 10, 2019 | Expired or cancelled withdrawn Mar 2023 | 1140 Ingerson Av | Modern Construction Design | add adu at basement level unit 1140-c per ordinance 162-16Details
add adu at basement level unit 1140-c per ordinance 162-16 | $45,000 |
| Apr 2, 2019 | Never finaled issued Apr 2019, no final | 1516 Broadway | Modern Construction Design | install 2 velux skylights.provide necessary sheetrock repairs for skylights and minor elec upgrade.mezz:provide work counter for employee & frame arch opening at work counter niche,install new storage closet door and refinish floor with grey micro topping & install new light fixtures at ceilingDetails
install 2 velux skylights.provide necessary sheetrock repairs for skylights and minor elec upgrade.mezz:provide work counter for employee & frame arch opening at work counter niche,install new storage closet door and refinish floor with grey micro topping & install new light fixtures at ceiling | $15,000 |
| Mar 8, 2019 | Expired or cancelled cancelled Mar 2020 | 1140 Ingerson Av | Modern Construction Design | unit legalization ordinance 43-14 at 1140-b located at 1st flr. adu separate permit.Details
unit legalization ordinance 43-14 at 1140-b located at 1st flr. adu separate permit. | $16,300 |
| Dec 17, 2018 | Completed final sign-off Mar 2019 | 1140 Ingerson Av | Modern Construction Design | reconfigure 2nd fl to add 2 bedrooms and a 2nd bathroom & 2 closets. no work on ground floor.Details
reconfigure 2nd fl to add 2 bedrooms and a 2nd bathroom & 2 closets. no work on ground floor. | $25,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 168 Corbett Av | Modern Construction Design | remodel of (e) kitchen & bathroom, addition of washer and dryer to both units.Details
remodel of (e) kitchen & bathroom, addition of washer and dryer to both units. | $85,000 |