Permit GraphShortlistSan Francisco building permits since 2000

Peter Batio

License
C52068
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C52068 at the Board for Professional Engineers
Listed as
architect, engineer
On San Francisco permits
Jan 2014 to Dec 2024

9 permits since 2000 (engineer on 6 permits, architect on 3 permits): 8 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
L E C A Construction Llc (3), Pineda Construction Inc (2), Remy's Quality Construction Inc., Speedy Construction Inc
Authorized agents
Kyle Lescano

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 9, 2024Completed
final sign-off Dec 2024
830 Moultrie Stg/f -remove unauthorized unit in garage: remove/demo illigal bathroom in basement hall/garage, remove/demo partition wall, hall bathroom, toilet, sink, shower pan, lights, wiring, all electrical & plumbing features & plug, all sewer drains in basement.
Details
Permit
202412096437
Permit issued
Dec 11, 2024
Final sign-off
Dec 24, 2024

g/f -remove unauthorized unit in garage: remove/demo illigal bathroom in basement hall/garage, remove/demo partition wall, hall bathroom, toilet, sink, shower pan, lights, wiring, all electrical & plumbing features & plug, all sewer drains in basement.

Open the permit page

$5,000
Nov 26, 2024Completed
final sign-off Feb 2025
405 Valencia StPineda Construction Incproposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement level
Details
Permit
202411265767
Permit issued
Jan 14, 2025
Final sign-off
Feb 5, 2025

proposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement level

Open the permit page

$45,000
Jul 19, 2021Completed
final sign-off Aug 2021
1702 Fell StL E C A Construction Llcopen (e) wall at 2 bathrooms and add 2 new windows at bathrooms -
Details
Permit
202107194638
Permit issued
Jul 21, 2021
Final sign-off
Aug 11, 2021

open (e) wall at 2 bathrooms and add 2 new windows at bathrooms -

Open the permit page

$2,000
Jun 25, 2021Completed
final sign-off Jan 2022
1702 Fell StL E C A Construction Llcunit 1 -add laundry room -hallway closet converted to laundry closet, stackable gas machines. ref pa 201903215929
Details
Permit
202106253284
Permit issued
Jun 28, 2021
Final sign-off
Jan 7, 2022

unit 1 -add laundry room -hallway closet converted to laundry closet, stackable gas machines. ref pa 201903215929

Open the permit page

$6,000
Aug 5, 2019Never finaled
issued Nov 2019, no final
111 Trenton St#3: new 15 sq ft closet addition within e building footprint at 3rd fl kitchen
Details
Permit
201908057910
Permit issued
Nov 5, 2019

#3: new 15 sq ft closet addition within e building footprint at 3rd fl kitchen

Open the permit page

$4,500
May 15, 2019Completed
final sign-off Jan 2021
449 Turk StPineda Construction Incalteration and remodel to e 29sq ft vestibule to administrative office at lower level. new replacement door, metal gate, new fixed window and new finishes
Details
Permit
201905150751
Permit issued
Sep 5, 2019
Final sign-off
Jan 21, 2021

alteration and remodel to e 29sq ft vestibule to administrative office at lower level. new replacement door, metal gate, new fixed window and new finishes

Open the permit page

$22,000
Mar 21, 2019Completed
final sign-off Sep 2019
1702 Fell StL E C A Construction Llcunit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinets
Details
Permit
201903215929
Permit issued
Mar 21, 2019
Final sign-off
Sep 30, 2019

unit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinets

Open the permit page

$20,000
Jan 8, 2019Completed
final sign-off Oct 2019
56 Mason StSpeedy Construction Inct.i. to (e) common area (lobby) @ main floor to include kitchen & eating area & laundry addition to (e) basement floor. also includes (n) appliances, (n) fixtures, (n) cabinets, (n) doors & (n) finishes. maher n/a.
Details
Permit
201901089812
Permit issued
Feb 13, 2019
Final sign-off
Oct 25, 2019

t.i. to (e) common area (lobby) @ main floor to include kitchen & eating area & laundry addition to (e) basement floor. also includes (n) appliances, (n) fixtures, (n) cabinets, (n) doors & (n) finishes. maher n/a.

Open the permit page

$85,000
Jan 16, 2014Completed
final sign-off Apr 2014
28 Melrose AvRemy's Quality Construction Inc.kitchen remodel, moving location of fridge & range. opening doorway from 3' to 8' from living room to kitchen. replace interior doors, & relocate 2 heating registers.
Details
Permit
201401166446
Permit issued
Jan 16, 2014
Final sign-off
Apr 14, 2014

kitchen remodel, moving location of fridge & range. opening doorway from 3' to 8' from living room to kitchen. replace interior doors, & relocate 2 heating registers.

Open the permit page

$38,000