Peter Batio
- Listed as
- architect, engineer
- On San Francisco permits
- Jan 2014 to Dec 2024
8 permits since 2000 (engineer on 5 permits, architect on 3 permits): 7 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2024 | Completed final sign-off Dec 2024 | 830 Moultrie St | g/f -remove unauthorized unit in garage: remove/demo illigal bathroom in basement hall/garage, remove/demo partition wall, hall bathroom, toilet, sink, shower pan, lights, wiring, all electrical & plumbing features & plug, all sewer drains in basement.Details
g/f -remove unauthorized unit in garage: remove/demo illigal bathroom in basement hall/garage, remove/demo partition wall, hall bathroom, toilet, sink, shower pan, lights, wiring, all electrical & plumbing features & plug, all sewer drains in basement. | $5,000 | |
| Nov 26, 2024 | Completed final sign-off Feb 2025 | 405 Valencia St | Pineda Construction Inc | proposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement levelDetails
proposed new kitchen within e 283 sq ft common room at main level and 185 sq ft storage room at basement level | $45,000 |
| Jul 19, 2021 | Completed final sign-off Aug 2021 | 1702 Fell St | L E C A Construction Llc | open (e) wall at 2 bathrooms and add 2 new windows at bathrooms -Details
open (e) wall at 2 bathrooms and add 2 new windows at bathrooms - | $2,000 |
| Aug 5, 2019 | Never finaled issued Nov 2019, no final | 111 Trenton St | #3: new 15 sq ft closet addition within e building footprint at 3rd fl kitchenDetails
#3: new 15 sq ft closet addition within e building footprint at 3rd fl kitchen | $4,500 | |
| May 15, 2019 | Completed final sign-off Jan 2021 | 449 Turk St | Pineda Construction Inc | alteration and remodel to e 29sq ft vestibule to administrative office at lower level. new replacement door, metal gate, new fixed window and new finishesDetails
alteration and remodel to e 29sq ft vestibule to administrative office at lower level. new replacement door, metal gate, new fixed window and new finishes | $22,000 |
| Mar 21, 2019 | Completed final sign-off Sep 2019 | 1702 Fell St | L E C A Construction Llc | unit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinetsDetails
unit #1: demo of non-load bearing wall between (e) kitchen & dining, also includes (n) replacement cabinets | $20,000 |
| Jan 8, 2019 | Completed final sign-off Oct 2019 | 56 Mason St | Speedy Construction Inc | t.i. to (e) common area (lobby) @ main floor to include kitchen & eating area & laundry addition to (e) basement floor. also includes (n) appliances, (n) fixtures, (n) cabinets, (n) doors & (n) finishes. maher n/a.Details
t.i. to (e) common area (lobby) @ main floor to include kitchen & eating area & laundry addition to (e) basement floor. also includes (n) appliances, (n) fixtures, (n) cabinets, (n) doors & (n) finishes. maher n/a. | $85,000 |
| Jan 16, 2014 | Completed final sign-off Apr 2014 | 28 Melrose Av | Remy's Quality Construction Inc. | kitchen remodel, moving location of fridge & range. opening doorway from 3' to 8' from living room to kitchen. replace interior doors, & relocate 2 heating registers.Details
kitchen remodel, moving location of fridge & range. opening doorway from 3' to 8' from living room to kitchen. replace interior doors, & relocate 2 heating registers. | $38,000 |