Paul Habekoss
- License
- S7131
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S7131 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Abekoss Engineering, Inc
- On San Francisco permits
- Jul 2023 to May 2025
5 permits since 2000 (engineer on 5 permits): 2 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Daniel Kelly Construction (2), A2z Remodeling Inc.
- Architects
- Maria Danielides
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2025 | Expired or cancelled expired Jul 2026 | 69 Fountain St | Daniel Kelly Construction | interior stair addition & remodel (315 sf) no exterior work, no habitable space added. remove e) foyer stair from 2nd to 3rd fl & infill flooring (interior stair). replace e) stiar from 1st to 2nd fl. add new stair from 2nd to 3rd fl. relocate e) half bathDetails
interior stair addition & remodel (315 sf) no exterior work, no habitable space added. remove e) foyer stair from 2nd to 3rd fl & infill flooring (interior stair). replace e) stiar from 1st to 2nd fl. add new stair from 2nd to 3rd fl. relocate e) half bath | $30,000 |
| Apr 29, 2025 | Expired or cancelled expired Aug 2026 | 304 Eureka St | Daniel Kelly Construction | remodel kitchen and bathroom | $80,000 |
| Feb 11, 2025 | Expired or cancelled expired Jul 2026 | 69 Fountain St | remove load bearing wall separating kitchen & family room. kitchen remodelDetails
remove load bearing wall separating kitchen & family room. kitchen remodel | $52,500 | |
| Jul 25, 2023 | Completed final sign-off Jul 2024 | 738 21st Av | install new window at north property line on 4th floor office.Details
install new window at north property line on 4th floor office. | $2,000 | |
| Jul 18, 2023 | Completed final sign-off Aug 2024 | 114 Edgewood Av | A2z Remodeling Inc. | 1 kitchen & 2 bath reomdel. half bath addition. upgrade new appliances, fixtures & finishes. new sliding patio door. new skylights. replace (e) windows.Details
1 kitchen & 2 bath reomdel. half bath addition. upgrade new appliances, fixtures & finishes. new sliding patio door. new skylights. replace (e) windows. | $400,000 |