Paul Habekoss
- License
- C87645
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C87645 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Habekoss Engineerings, Inc
- On San Francisco permits
- Dec 2021 to Nov 2024
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kl Construction Group (2), Daniel Kelly Construction
- Architects
- Cindy Sterry
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 15, 2024 | Completed final sign-off Oct 2025 | 123 Forest View Dr | Kl Construction Group | revision to the permit#: 202206307440. relocation of laundry space and sink.Details
revision to the permit#: 202206307440. relocation of laundry space and sink. | |
| Jun 30, 2022 | Completed final sign-off Oct 2025 | 123 Forest View Dr | Kl Construction Group | interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade.Details
interior remodel of (e) un-finished 1st story, including new full bath. associated mechanical, plumbing, and electrical improvements. no change to existing footprint or street facing facade. | $80,000 |
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 762 Funston Av | remove and replace (e) rear yard deck with new (to match existing).Details
remove and replace (e) rear yard deck with new (to match existing). | $25,000 | |
| Dec 17, 2021 | Completed final sign-off May 2023 | 4316 23rd St | Daniel Kelly Construction | main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to officeDetails
main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to office | $200,000 |