Naresh Palkhiwla
- License
- 26608
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Rapid Racl
- On San Francisco permits
- Feb 2005 to Jan 2022
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 2 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dan Howards Consulting, Raymond Handling Concepts Corp, Silman Venture Corp/Dba Silman Construct
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 18, 2022 | Completed final sign-off Apr 2023 | 900 Pennsylvania Av | Silman Venture Corp/Dba Silman Construct | installation of 22,828 sq ft of pre-manufactured storage racks in existing warehouse on grade level.Details
installation of 22,828 sq ft of pre-manufactured storage racks in existing warehouse on grade level. | $1,100,000 |
| Mar 6, 2020 | Expired or cancelled expired Oct 2021 | 225 Industrial St | Dan Howards Consulting | install 17 units of shelving: 84"/80"/96" tall x 12"/18"/24" d x 36"/48" w- 223 sq ft partian. 67 li ft. compliance for shelving new nov 201908274Details
install 17 units of shelving: 84"/80"/96" tall x 12"/18"/24" d x 36"/48" w- 223 sq ft partian. 67 li ft. compliance for shelving new nov 201908274 | $2,500 |
| Jun 21, 2005 | Never finaled issued Jun 2005, no final | 170 Ofarrell St | install rapid pack storage system at 4th floor womens shoes stockroomDetails
install rapid pack storage system at 4th floor womens shoes stockroom | $15,000 | |
| Feb 18, 2005 | Completed final sign-off Aug 2005 | 3000 03rd St | Raymond Handling Concepts Corp | pallet rack installation may impact current parking spaces.Details
pallet rack installation may impact current parking spaces. | $30,000 |