Julia Pellegrini
- License
- C31917
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Mpada
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Nov 2026
12 permits since 2000 (architect on 12 permits): 8 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Brady Construction Inc (3), Olive Remodeling (2), Bridges Mr Development Inc, Core Construction, K A Lau Construction, O&F Construction, Ramos General Construction Inc., Rich Mathers Construction Inc, Terence Mcmahon Construction
- Engineers
- Mike Hom (2), Michael Hom
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 5
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 1554 Chestnut St | Olive Remodeling | adu conversion of an (e) non-dwelling room on the lower level.Details
adu conversion of an (e) non-dwelling room on the lower level. | $30,000 |
| Nov 18, 2025 | Completed final sign-off Jun 2026 | 1355 20th Av | O&F Construction | no change to sf. replace (5) windows in kind w/ new windows.(n) bathroom in(e) bath location at lower level, (n) doors at lower level.(n) laundry area w/ storage,(n) lighting at lower level,(n) ducting, (n) wall w/ door at garage to enclose(n) storage area.Details
no change to sf. replace (5) windows in kind w/ new windows.(n) bathroom in(e) bath location at lower level, (n) doors at lower level.(n) laundry area w/ storage,(n) lighting at lower level,(n) ducting, (n) wall w/ door at garage to enclose(n) storage area. | $62,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 390 27th Av | Terence Mcmahon Construction | revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath.Details
revision to pa #20250802671: renovate primary suite including bathroom & walk in closet. renovate main bathroom. replace in kind windows in primary bath, bedroom and main bath. | $82,000 |
| Jun 25, 2025 | Completed final sign-off Oct 2025 | 88 King St | K A Lau Construction | 3rd fl: demo existing business center curved wall with new millwork in lounge area. add 3 new outletsDetails
3rd fl: demo existing business center curved wall with new millwork in lounge area. add 3 new outlets | $20,000 |
| Apr 2, 2025 | Completed final sign-off May 2025 | 1552 Chestnut St | Olive Remodeling | legalize unpermitted room and wet bar at the rear of the garage, to remove unpermitted roof covering at secondary exterior stairwell.Details
legalize unpermitted room and wet bar at the rear of the garage, to remove unpermitted roof covering at secondary exterior stairwell. | $12,000 |
| Sep 8, 2023 | Completed final sign-off Nov 2024 | 176 Jordan Av | Bridges Mr Development Inc, Rich Mathers Construction Inc | renovation to (e) single family residence, new kitchen in (e) kitchen location on the main fl. level and replacing select windows in-kind along the side and back elevations, the (e) mechanical system is to remain and there will be new electrical work for the kitchen as needed no change toDetails
renovation to (e) single family residence, new kitchen in (e) kitchen location on the main fl. level and replacing select windows in-kind along the side and back elevations, the (e) mechanical system is to remain and there will be new electrical work for the kitchen as needed no change to | $72,000 |
| Jun 14, 2023 | Never finaled issued Jul 2023, no final | 1139 Vallejo St | Ramos General Construction Inc. | kitchen and bathroom remodel. upgrade electrical/ sub panel and new laundry. work located on 3rd floor. new hot water heater & heat pump. new washer and dryer. replace (e) fire place. add 2 new skylightsDetails
kitchen and bathroom remodel. upgrade electrical/ sub panel and new laundry. work located on 3rd floor. new hot water heater & heat pump. new washer and dryer. replace (e) fire place. add 2 new skylights | $15,000 |
| Mar 30, 2023 | Completed final sign-off Feb 2024 | 1470 Portola Dr | Brady Construction Inc | replace in kind entry stair and porch finish, to replace the (e) cracked stairsDetails
replace in kind entry stair and porch finish, to replace the (e) cracked stairs | $15,000 |
| Aug 17, 2021 | Never finaled issued Jan 2022, no final | 650 Delancey St | Core Construction | #105: remodel kitchen. reconfigure bathrooms, relocate washer and dryer, (n) stair in (e) stair location. relocate water heater & furnace. add cooling, (n) glass guardrail at loft.Details
#105: remodel kitchen. reconfigure bathrooms, relocate washer and dryer, (n) stair in (e) stair location. relocate water heater & furnace. add cooling, (n) glass guardrail at loft. | $55,000 |
| Jul 29, 2021 | Completed final sign-off Jul 2023 | 1470 Portola Dr | Brady Construction Inc | existing basement remodel within (e) envelope, adding (2) bathrooms, & bedroom, interior remodel to kitchen and bathrooms replace exterior wood deck and stairs, eplace in kind all windows, except bathroom window leaded glass windows to remain- insulated inserts on interiorDetails
existing basement remodel within (e) envelope, adding (2) bathrooms, & bedroom, interior remodel to kitchen and bathrooms replace exterior wood deck and stairs, eplace in kind all windows, except bathroom window leaded glass windows to remain- insulated inserts on interior | $200,000 |
| May 24, 2021 | Completed final sign-off Apr 2022 | 65 San Lorenzo Wy | Brady Construction Inc | window replacement and interior kitchen, bathroom, and basement remodel. add new half bathDetails
window replacement and interior kitchen, bathroom, and basement remodel. add new half bath | $50,000 |
| Nov 7, 2019 | Completed final sign-off Oct 2021 | 242 Powell St | renovation of (e) grnd fl facade. project includes new ground fl, steel & glass storefront,ground fl facade material, new marquee with recessed down lights & backlit signage;preservation of the (e) historic lintel & belt cornice; alteration of fire escape; relocation of fdc under separate permitDetails
renovation of (e) grnd fl facade. project includes new ground fl, steel & glass storefront,ground fl facade material, new marquee with recessed down lights & backlit signage;preservation of the (e) historic lintel & belt cornice; alteration of fire escape; relocation of fdc under separate permit | $142,055 |