Michael Whelan
- License
- C69833
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C69833 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jan 2021 to Jan 2021
13 permits since 2000 (engineer on 13 permits): 10 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rubecon General Contracting Inc (13)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 5
- Other or unknown 8
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 8 of 13 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2021 | Completed final sign-off Feb 2023 | 890 Hudson Av | Rubecon General Contracting Inc | to demolish a one story, type 5, storage shed.Details
to demolish a one story, type 5, storage shed. | $10,000 |
| Jan 29, 2021 | Completed final sign-off Feb 2023 | 404 Griffith St | Rubecon General Contracting Inc | tool shed - to demolish a one story, type 5, storage shed.Details
tool shed - to demolish a one story, type 5, storage shed. | $10,000 |
| Jan 29, 2021 | Completed final sign-off Feb 2023 | 901 Hudson Av | Rubecon General Contracting Inc | boatyard storage - to demolish a one story, type 5, storage shed.Details
boatyard storage - to demolish a one story, type 5, storage shed. | $20,000 |
| Jan 29, 2021 | Completed final sign-off Feb 2023 | 901 Hudson Av | Rubecon General Contracting Inc | yard shop/storage - to demolish a one story, type 5, storage shed.Details
yard shop/storage - to demolish a one story, type 5, storage shed. | $10,000 |
| Jan 29, 2021 | Completed final sign-off Feb 2023 | 404 Griffith St | Rubecon General Contracting Inc | boat office - to demolish a one story, type 5, storage shed.Details
boat office - to demolish a one story, type 5, storage shed. | $5,000 |
| Jan 27, 2021 | Completed final sign-off Apr 2024 | 404 Griffith St | Rubecon General Contracting Inc | remove soil and backfill equivalent with clean material, compact.Details
remove soil and backfill equivalent with clean material, compact. | $10,500 |
| Jan 27, 2021 | Never finaled issued Jun 2021, no final | 890 Hudson Av | Rubecon General Contracting Inc | parcel complete submerged (water lot)Details
parcel complete submerged (water lot) | $30,000 |
| Jan 27, 2021 | Completed final sign-off Apr 2024 | 808 Innes Av | Rubecon General Contracting Inc | remove soil and backfill equivalen with clean material, compact.Details
remove soil and backfill equivalen with clean material, compact. | $10,000 |
| Jan 27, 2021 | Never finaled issued Jun 2021, no final | 901 Hudson Av | Rubecon General Contracting Inc | remove soil and backfill equivalen with clean material, compaction.Details
remove soil and backfill equivalen with clean material, compaction. | $120,000 |
| Jan 27, 2021 | Completed final sign-off Apr 2024 | 908 Innes Av | Rubecon General Contracting Inc | remove soil and backfill equivalen with clean material, compact.Details
remove soil and backfill equivalen with clean material, compact. | $22,500 |
| Jan 27, 2021 | Completed final sign-off Apr 2024 | 900 Hudson Av | Rubecon General Contracting Inc | remove soil and backfill equivalen with clean material to depth ranging from 2 ft - 4 ft- compaction to follow. remove sediment in submerged lots and backfill with equivalent material. compaction only required for areas outside of the submerged zone.Details
remove soil and backfill equivalen with clean material to depth ranging from 2 ft - 4 ft- compaction to follow. remove sediment in submerged lots and backfill with equivalent material. compaction only required for areas outside of the submerged zone. | $105,000 |
| Jan 27, 2021 | Expired or cancelled expired Feb 2026 | 900 Innes Av | Rubecon General Contracting Inc | work to occur around structure/cottage. offset work 5-ft from structure/cottage; minimal grading work and fill proposed around offset perimeter.Details
work to occur around structure/cottage. offset work 5-ft from structure/cottage; minimal grading work and fill proposed around offset perimeter. | $7,500 |
| Jan 27, 2021 | Completed final sign-off Apr 2024 | 904 Innes Av | Rubecon General Contracting Inc | remove soil and backfill equivalen with clean material, compact.Details
remove soil and backfill equivalen with clean material, compact. | $21,000 |