Michael Heacock
- License
- C32082
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Apr 2012 to Apr 2024
4 permits since 2000 (architect on 4 permits): 3 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rossi Builders Inc. (2), Pacific Engineering & Construction Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 25, 2024 | In progress filed Apr 2024, not yet issued | 545 Point Lobos Av | requesting technical infeasibility to comply with abe program. abe 201806110603. for restaurant only.Details
requesting technical infeasibility to comply with abe program. abe 201806110603. for restaurant only. | ||
| Dec 11, 2020 | Completed final sign-off Jul 2021 | 585 Howard St | Pacific Engineering & Construction Inc. | applying for change of occupancy from m to b. based on apprvd conditionl use permit to convert grnd flr & mezz to office space apprvd by planning dept on 4/23/2020. record # 2018-016668 cua. will be implementing conditions of approval. removing frosted film from st lvl wndws-howard stDetails
applying for change of occupancy from m to b. based on apprvd conditionl use permit to convert grnd flr & mezz to office space apprvd by planning dept on 4/23/2020. record # 2018-016668 cua. will be implementing conditions of approval. removing frosted film from st lvl wndws-howard st | $5,000 |
| May 8, 2012 | Completed final sign-off Oct 2012 | 5 03rd St | Rossi Builders Inc. | 9th floor - construction of full height furniture partitions to create 1 conf room, & 8 offices. mech, elec, life safety, & sprinkler modifications are not under this permit.Details
9th floor - construction of full height furniture partitions to create 1 conf room, & 8 offices. mech, elec, life safety, & sprinkler modifications are not under this permit. | $50,000 |
| Apr 5, 2012 | Completed final sign-off Apr 2012 | 5 03rd St | Rossi Builders Inc. | suite #900 & 909-demo of non structural interior partitions & base cabinet & sink. no path of travel per ab-017,Details
suite #900 & 909-demo of non structural interior partitions & base cabinet & sink. no path of travel per ab-017, | $6,843 |