Michael A. Mcguire
- Listed as
- engineer
- Firm
- Cobalt Power Systems Inc
- Based in
- Mountain View
- On San Francisco permits
- Jul 2025 to Jul 2025
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2025 | In progress filed Jul 2025, not yet issued | 1700 Montgomery St | Cobalt Power Systems Inc | solar:install 268.69kw (554) hanwha q.cells q.peak duo xl-g10.3/bfg 485,485w pv modules - (278) solar edge s1201 dual optimizers (2) inputs ea.(2) solar edge se120kus synergy pv inverters - (1) ironridge bx mounting system at 10° tilt-(1) squared load center 400a 3? 4w 480y/277vac main lugs pn #nf43Details
solar:install 268.69kw (554) hanwha q.cells q.peak duo xl-g10.3/bfg 485,485w pv modules - (278) solar edge s1201 dual optimizers (2) inputs ea.(2) solar edge se120kus synergy pv inverters - (1) ironridge bx mounting system at 10° tilt-(1) squared load center 400a 3? 4w 480y/277vac main lugs pn #nf43 | $404,393 |