Matthew Masilionis
- License
- C29101
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Perspective Architect
- Based in
- Mission Woods
- On San Francisco permits
- Jul 2021 to Sep 2021
2 permits since 2000 (architect on 2 permits): 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Retail Construction Services (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2021 | Never finaled issued Oct 2021, no final | 406 Jackson St | Retail Construction Services | revision to app# 202107083989. updates to 1st floor ada restroom to provide required clearances. update plumbing fixtures to provide clearance at baby changing station.Details
revision to app# 202107083989. updates to 1st floor ada restroom to provide required clearances. update plumbing fixtures to provide clearance at baby changing station. | $2,500 |
| Jul 8, 2021 | Never finaled issued Aug 2021, no final | 406 Jackson St | Retail Construction Services | t.i. fit-out for retail space, architectural, mep, structural work. no exteiror/ roof work. no change of use. removing 1 section of wall on lower level.(e) hvac/ductwork system to remain.Details
t.i. fit-out for retail space, architectural, mep, structural work. no exteiror/ roof work. no change of use. removing 1 section of wall on lower level.(e) hvac/ductwork system to remain. | $300,000 |