Martielli Design
- Listed as
- engineer
- Based in
- Sf
- On San Francisco permits
- Jun 2025 to Jun 2025
1 permit since 2000 (engineer on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2025 | Completed final sign-off Jun 2026 | 265 Castro St | replace front step and landing with brick, replace drive way with pavers, replace front metal fence and gate and add trash screening wall with brick wrapped cmu, add pre fab planter replace fence along 3 sides at rear add prefabricated greenhoouse at rear yardDetails
replace front step and landing with brick, replace drive way with pavers, replace front metal fence and gate and add trash screening wall with brick wrapped cmu, add pre fab planter replace fence along 3 sides at rear add prefabricated greenhoouse at rear yard | $15,000 |