Mark Swenson
- Listed as
- architect
- Firm
- Studio C
- Based in
- Dan Diego
- On San Francisco permits
- Mar 2006 to Oct 2012
5 permits since 2000 (architect on 5 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2012 | Completed final sign-off Mar 2013 | 1415 Ocean Av | U.S. Samson Construction | revision 201204188545. remove e 2 baths. change entry door to pair swing doors with alcove. add concrete in sales area flush with highest point to eliminate ramp and slope back 1% to storefrontDetails
revision 201204188545. remove e 2 baths. change entry door to pair swing doors with alcove. add concrete in sales area flush with highest point to eliminate ramp and slope back 1% to storefront | $2,000 |
| Nov 13, 2008 | Completed final sign-off Feb 2009 | 245 Post St | revision to pa #200808078661, scope of work is revision to reflected ceiling plans & change in lighting only.Details
revision to pa #200808078661, scope of work is revision to reflected ceiling plans & change in lighting only. | $2,000 | |
| Apr 3, 2007 | Completed final sign-off May 2007 | 188 Ofarrell St | replace storefront, add entry door, new mechanical unit to be installed. repalce all finishes, upgrade to new lights & fixtures. all interior.Details
replace storefront, add entry door, new mechanical unit to be installed. repalce all finishes, upgrade to new lights & fixtures. all interior. | $55,000 | |
| Apr 3, 2007 | Completed final sign-off Oct 2007 | 2800 Leavenworth St | Dan Kuykendall Enterprises Inc/Kcs Gen C | suite#114-interior soft demolition,new structural support,new t-24 hc compliant employees restroom and related plumbing,concrete patching,replace exterior storefront,new electrical & lighting, new hvac heat pump & distribution ducting, metal stud framing,drywall,acoustic ceiling,casework & finishes.Details
suite#114-interior soft demolition,new structural support,new t-24 hc compliant employees restroom and related plumbing,concrete patching,replace exterior storefront,new electrical & lighting, new hvac heat pump & distribution ducting, metal stud framing,drywall,acoustic ceiling,casework & finishes. | $90,750 |
| Mar 22, 2006 | Completed final sign-off May 2006 | 3251 20th Av | demo extg cieling fill in door relocate door, new ceiling, cash wrap, dispaly cases shelves, relocate storefront for retail space 742 sq ft/level 2/sprinklers on seperate permitDetails
demo extg cieling fill in door relocate door, new ceiling, cash wrap, dispaly cases shelves, relocate storefront for retail space 742 sq ft/level 2/sprinklers on seperate permit | $52,570 |