Mark Hoffman
- Listed as
- architect
- Firm
- Light Space Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2022 to Nov 2023
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 13, 2023 | Completed final sign-off Nov 2025 | 3048 Fillmore St | reconstruction of (e) rear cottage to comply w/ nov #202295341 & #2022008690 enf. pre-existing building was a small cottage 10'-5" above grade; reconstructed is 17'-6" above grade.Details
reconstruction of (e) rear cottage to comply w/ nov #202295341 & #2022008690 enf. pre-existing building was a small cottage 10'-5" above grade; reconstructed is 17'-6" above grade. | $100,000 | |
| Aug 25, 2022 | Completed final sign-off Aug 2023 | 185 Edgewood Av | Terence Mcmahon Construction | proposed project consist of 2 interior bathroom remodels and primary bedroom closet spaces. this includes the removal of non-structural walls, replacement walls, replacement of lighting adjustments to plumbing locations in the primary bathroom and replacement of fixture in th secondary bathroom.Details
proposed project consist of 2 interior bathroom remodels and primary bedroom closet spaces. this includes the removal of non-structural walls, replacement walls, replacement of lighting adjustments to plumbing locations in the primary bathroom and replacement of fixture in th secondary bathroom. | $73,800 |