Mark Frisch
- License
- C29704
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jan 2007 to Nov 2013
4 permits since 2000 (architect on 4 permits): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Engineers
- Sunil Gupta
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2013 | Expired or cancelled withdrawn Jan 2014 | 288 Beale St | erect a 8 story xx units condo & commercial building. | ||
| Mar 12, 2008 | Completed final sign-off Jun 2008 | 16 Maiden Ln | lighting to be adjusted accordingly, some milkwork in office space on 2 floors 3rd & 4th. selective demo, new walls, ceiling, flooring & paint.Details
lighting to be adjusted accordingly, some milkwork in office space on 2 floors 3rd & 4th. selective demo, new walls, ceiling, flooring & paint. | $75,000 | |
| Feb 22, 2007 | Completed final sign-off Sep 2007 | 16 Maiden Ln | work on 4th floor. wrap columns with gypsum boards (e) walls to structure above to be furred. no structural work.Details
work on 4th floor. wrap columns with gypsum boards (e) walls to structure above to be furred. no structural work. | $60,000 | |
| Jan 30, 2007 | Completed final sign-off Feb 2008 | 16 Maiden Ln | 4th floor-ref pa# 200604179172-patch & repair floor, interior demo on 4th floor only. construction walls in confderence room, new idf room and coffee station. no structural work.Details
4th floor-ref pa# 200604179172-patch & repair floor, interior demo on 4th floor only. construction walls in confderence room, new idf room and coffee station. no structural work. | $60,000 |