Lou Gilpin
- License
- 1518
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Gilpin Geoscience
- Based in
- Napa
- On San Francisco permits
- Mar 2012 to Nov 2016
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Soil Engineering Construction (2)
- Engineers
- Benjamin Lai
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 29, 2016 | Completed final sign-off Jul 2017 | 1222 Clayton St | Soil Engineering Construction | construction/slope stabilization in response to nov 201605701. slope stabiliazation includes scaling of loose rock installation of rock bolt anchors supporting steel mech catchment fence will be installed upslope of sidewalk, erosion control improvementsDetails
construction/slope stabilization in response to nov 201605701. slope stabiliazation includes scaling of loose rock installation of rock bolt anchors supporting steel mech catchment fence will be installed upslope of sidewalk, erosion control improvements | $130,000 |
| Mar 6, 2012 | Completed final sign-off Aug 2013 | 150 Hampshire St | Soil Engineering Construction | to comply with nov 201109761. scale loose rock from rock face. off haul and dispose. intall rocks bolts. install rockfall protection mesh.Details
to comply with nov 201109761. scale loose rock from rock face. off haul and dispose. intall rocks bolts. install rockfall protection mesh. | $140,000 |