L.J. Caballero
- Listed as
- engineer
- Firm
- Lj Caballero & Assoc
- Based in
- Pismo Beach
- On San Francisco permits
- Nov 2008 to Jul 2021
13 permits since 2000 (engineer on 13 permits): 11 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2021 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2020-0622-8968 replace any (e) wood rot with new material on all walls & ceilings. concrete for foundation to be of min 2500 psiDetails
revision to pa 2020-0622-8968 replace any (e) wood rot with new material on all walls & ceilings. concrete for foundation to be of min 2500 psi | $5,000 |
| Jun 17, 2021 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2019-1218-9873 to replace damaged concrete slab @ ground floorDetails
revision to pa 2019-1218-9873 to replace damaged concrete slab @ ground floor | $15,000 |
| Mar 31, 2021 | Completed final sign-off Feb 2023 | 1567 Beach St | Ly Green Construction Inc | remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room.Details
remodel the entire house. upgrade main panel from 100 to 200a. relocate kitchen to dinning room area. add master bathroom in (e) kitchen location. convert 523sf part of (e) non habitable area on ground flr to office and laundry room. | $250,000 |
| Oct 30, 2020 | Completed final sign-off Dec 2020 | 360 Fillmore St | Ly Green Construction Inc | emergencey repair of small section of front wall broken by car. some wall framing to be replaced to comply with nov # 202048431Details
emergencey repair of small section of front wall broken by car. some wall framing to be replaced to comply with nov # 202048431 | $27,000 |
| Sep 15, 2020 | Completed final sign-off Feb 2021 | 4141 20th St | Spryscapes Const Inc. | replace front entry wood stairs.Details
replace front entry wood stairs. | $55,000 |
| Jun 22, 2020 | Completed final sign-off Jun 2022 | 38 Southwood Dr | Ly Green Construction Inc | revision to pa 2019-1218-9873, revised upstairs ktichen layout and new roof framing; infill window openings and door on lower level; addition of landing and steps on north side of property; partial foundation replacement per structural drawingsDetails
revision to pa 2019-1218-9873, revised upstairs ktichen layout and new roof framing; infill window openings and door on lower level; addition of landing and steps on north side of property; partial foundation replacement per structural drawings | $30,000 |
| Sep 23, 2019 | Completed final sign-off Jul 2020 | 1125 Francisco St | Home Quality Remodeling | unit 4 - minor remodel to convert hallway closet to 1/2 bath; change dining room to closet.Details
unit 4 - minor remodel to convert hallway closet to 1/2 bath; change dining room to closet. | $10,000 |
| Sep 14, 2018 | Completed final sign-off Feb 2020 | 220 Glenview Dr | Lee Construction | see scope of work on sheet cs of drawing set. add 2 bedroom, 2 baths and living space ground level and lower level. replace front windows wood or fiberglass and add new windows rear of houseDetails
see scope of work on sheet cs of drawing set. add 2 bedroom, 2 baths and living space ground level and lower level. replace front windows wood or fiberglass and add new windows rear of house | $230,000 |
| Feb 2, 2018 | Completed final sign-off Feb 2018 | 3241 Mission St | Atlas Constr& Dev. Dba:Good Fellas Const | unit 8: framing remodel work to replace structural beam due to dry rot in dining rm area.Details
unit 8: framing remodel work to replace structural beam due to dry rot in dining rm area. | $5,000 |
| Nov 8, 2017 | Completed final sign-off Jan 2018 | 20 Westwood Dr | Atlas Constr& Dev. Dba:Good Fellas Const | remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen windowDetails
remodel kitchen, remove load bearing wall per engineer plans, upgrde eled, plumbing, mech to code, install flooring, new cabinets, countertops, replace kitchen window | $25,000 |
| Aug 2, 2012 | Completed final sign-off Feb 2013 | 124 04th Av | revision to appl #2012.05.04.9809 - structural/framing change to existing approved plans, revise access to attic from a stairway to just an attic access.Details
revision to appl #2012.05.04.9809 - structural/framing change to existing approved plans, revise access to attic from a stairway to just an attic access. | ||
| Nov 13, 2008 | Expired or cancelled expired Jan 2011 | 2820 Greenwich St | A 1 Builders | revision to 200811035679: make 6' opening and relocate light switch in bedroom and hallwayDetails
revision to 200811035679: make 6' opening and relocate light switch in bedroom and hallway | |
| Nov 3, 2008 | Expired or cancelled expired Jan 2011 | 2820 Greenwich St | A 1 Builders | work @ unit# 2 only. opening up 10' section of wall. relocate a switch & an outlet.Details
work @ unit# 2 only. opening up 10' section of wall. relocate a switch & an outlet. | $6,000 |