Lisa Hobson
- Listed as
- architect, engineer
- Firm
- Engineered Soil Repairs
- Based in
- Walnut Creek
- On San Francisco permits
- Jun 2007 to Mar 2012
4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 3 completed, 1 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 26, 2012 | Completed final sign-off Jul 2012 | 45 Scenic Wy | Engineered Soils Repairs | install a subdrain system witin the rear lawn area. discharge the new subdrain system into new sand interceptors.Details
install a subdrain system witin the rear lawn area. discharge the new subdrain system into new sand interceptors. | $13,800 |
| Jun 22, 2010 | Completed final sign-off Jan 2011 | 875 Church St | Engineered Soils Repairs | replace retaining wall 4' high on side propert line at rear.Details
replace retaining wall 4' high on side propert line at rear. | $26,800 |
| Oct 22, 2007 | Expired or cancelled expired Jan 2010 | 289 Randall St | Engineered Soils Repairs | revision to application # 200706295606 to show attachment of new footing to existing footing.Details
revision to application # 200706295606 to show attachment of new footing to existing footing. | |
| Jun 6, 2007 | Completed final sign-off Aug 2007 | 220 Upper Tr | Engineered Soils Repairs | sub drain and surface drainage system-remove and replace deck as necessary and stairsDetails
sub drain and surface drainage system-remove and replace deck as necessary and stairs | $14,000 |