Lin Meinhardt
- License
- C21257
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C21257 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Lin & Meinhardt
- On San Francisco permits
- Jun 2005 to Mar 2008
5 permits since 2000 (architect on 4 permits, engineer on 1 permit): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mutual Seiko Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2008 | Completed final sign-off Jul 2008 | 3107 Geary Bl | tenant improvement on 2nd floor space for office use of a shell building improvement-approved under pa# 200506034144. includes sprinkler system modification.Details
tenant improvement on 2nd floor space for office use of a shell building improvement-approved under pa# 200506034144. includes sprinkler system modification. | $30,000 | |
| Jul 14, 2006 | Completed final sign-off Jan 2007 | 3107 Geary Bl | partial tenant improvement on 3/f space for medical office shell bldg improvement approved under app #2005/06/03/4144Details
partial tenant improvement on 3/f space for medical office shell bldg improvement approved under app #2005/06/03/4144 | $30,000 | |
| Apr 17, 2006 | Completed final sign-off Jan 2007 | 3107 Geary Bl | sprinkler plans for work related to appl#200506034144.Details
sprinkler plans for work related to appl#200506034144. | $8,000 | |
| Dec 2, 2005 | Completed final sign-off Jan 2007 | 3107 Geary Bl | for soft demo,removal of interior partition walls,drywalls,ceilings & countertops as indicated in plan at basement, 1/f & 2/f to comply with abit sfbc.no other work.Details
for soft demo,removal of interior partition walls,drywalls,ceilings & countertops as indicated in plan at basement, 1/f & 2/f to comply with abit sfbc.no other work. | $8,500 | |
| Jun 3, 2005 | Completed final sign-off Jan 2007 | 3107 Geary Bl | Mutual Seiko Construction | alter (e)commercial bldg.the proposed alteration incl an extension of the (e)mezzanine level to form a full story at front of bldg,& a rear vertical addition over the (e)1 story portion of bldg to match the height of the (e) front bldg recape.sprinkler sys to be provided as per cope sec 904-2.2.(1).Details
alter (e)commercial bldg.the proposed alteration incl an extension of the (e)mezzanine level to form a full story at front of bldg,& a rear vertical addition over the (e)1 story portion of bldg to match the height of the (e) front bldg recape.sprinkler sys to be provided as per cope sec 904-2.2.(1). | $500,000 |