Leslie Young
- Listed as
- architect
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Jul 2015
8 permits since 2000 (architect on 8 permits): 3 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2015 | Expired or cancelled cancelled Mar 2017 | 935 Geary St | Urban Craftsman Builders | change of use. establish medical cannabis dispensory in (e)grd floor retail space in (e) 10 story bldg.minimal renovation only restroom&electrical work to conform to accessibility req.Details
change of use. establish medical cannabis dispensory in (e)grd floor retail space in (e) 10 story bldg.minimal renovation only restroom&electrical work to conform to accessibility req. | $20,000 |
| Aug 21, 2012 | Completed final sign-off Oct 2012 | 2050 Bryant St | Wong Yiu Construction | minor revision to pa# 201012025981 due to field conditions move one door to level area, utility ramp changed to 2 stairs, switche from metal studs to wood framing, reduce run of 1:20 walking surface in corridor.Details
minor revision to pa# 201012025981 due to field conditions move one door to level area, utility ramp changed to 2 stairs, switche from metal studs to wood framing, reduce run of 1:20 walking surface in corridor. | |
| Dec 2, 2010 | Completed final sign-off Oct 2012 | 2050 Bryant St | Wong Yiu Construction | construct 1-hour fire rated exit tunnel to rear exit per sffd for place of assembly permit. legalize previous non-permitted construction. preapplication meeting notes (2/12/10) included. change of occupancy to reflect long-term use.Details
construct 1-hour fire rated exit tunnel to rear exit per sffd for place of assembly permit. legalize previous non-permitted construction. preapplication meeting notes (2/12/10) included. change of occupancy to reflect long-term use. | $10,000 |
| Jan 13, 2010 | Expired or cancelled cancelled Jan 2026 | 910 Harrison St | t.i. to change use from parking bays to three smaller indoor nursery spaces. replace non-complying stairs & entry & restroom with jnew complying accessible features. install new walls. mep & t-24 compliance under separate permit.Details
t.i. to change use from parking bays to three smaller indoor nursery spaces. replace non-complying stairs & entry & restroom with jnew complying accessible features. install new walls. mep & t-24 compliance under separate permit. | $34,000 | |
| Aug 29, 2006 | Completed final sign-off Apr 2014 | 1080 Sutter St | erect 11 stories, 35 dwelling units mixed use building.Details
erect 11 stories, 35 dwelling units mixed use building. | $2,500,000 | |
| Feb 21, 2006 | Expired or cancelled expired Dec 2017 | 1860 Van Ness Av | Mountain Bay Construction | to erect 8 stories, 35 dwelling units of residential & retail store.Details
to erect 8 stories, 35 dwelling units of residential & retail store. | $1,000,000 |
| Feb 21, 2006 | Expired or cancelled expired Dec 2017 | 1860 Van Ness Av | to demolish 1 story canopy (service station)Details
to demolish 1 story canopy (service station) | ||
| Feb 10, 2006 | Expired or cancelled withdrawn May 2018 | 793 South Van Ness Av | to erect 5 stories, 29 units of residential, commercial & retail building.Details
to erect 5 stories, 29 units of residential, commercial & retail building. | $1,000,000 |