Leah Baker
- License
- C36605
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Leah Baker Architect
- Based in
- Denver
- On San Francisco permits
- Jan 2019 to Dec 2021
3 permits since 2000 (architect on 3 permits): 1 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Palmera Construction Co, Solid Bay Construction Sf
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2021 | Never finaled issued Nov 2022, no final | 682 24th Av | Solid Bay Construction Sf | interior reno: new int. walls,partitions, finishes,fixtures,fittings thourhgout. infill lightwell at 2/f northwall. horizontal addition to infill area at 1/f from (e) ext. wall to prop. line. n roof deck at rear w/penthouse enclosure for stairs. modify e windows/doors. add n wndws, doors, skylightsDetails
interior reno: new int. walls,partitions, finishes,fixtures,fittings thourhgout. infill lightwell at 2/f northwall. horizontal addition to infill area at 1/f from (e) ext. wall to prop. line. n roof deck at rear w/penthouse enclosure for stairs. modify e windows/doors. add n wndws, doors, skylights | $250,000 |
| Jan 23, 2019 | Completed final sign-off May 2019 | 4300 23rd St | Palmera Construction Co | to comply with violation #201520591. repair the fire damage.Details
to comply with violation #201520591. repair the fire damage. | $500 |
| Jan 11, 2019 | Expired or cancelled withdrawn Feb 2022 | 652 18th Av | interior renovation to (e) 3rd fl bathroom. fill in (e) window at 3rd fl bathroom. provide (n) skulight at 3rd floor bathroom. provide (n) french door in (e) modified openingDetails
interior renovation to (e) 3rd fl bathroom. fill in (e) window at 3rd fl bathroom. provide (n) skulight at 3rd floor bathroom. provide (n) french door in (e) modified opening | $7,000 |