Lai Hao Shu
- Listed as
- engineer
- On San Francisco permits
- Dec 2009 to Apr 2016
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2016 | Completed final sign-off Jun 2016 | 415 Judah St | 1) add new closet in 2nd bedroom. 2)remodeling extg bathroom and replace lavatory on extg location, (vif) smoke detectors on every bedrooms. non work at basement commercial space and on exterior work.Details
1) add new closet in 2nd bedroom. 2)remodeling extg bathroom and replace lavatory on extg location, (vif) smoke detectors on every bedrooms. non work at basement commercial space and on exterior work. | $10,000 | |
| Mar 24, 2015 | Completed final sign-off Jul 2015 | 8 Desmond St | revision to pa # 2014 0627 9766; remove partition @ kitchen & operations. relocate filing cabinet @ front office & add storage @ package room, remove 3'0" +/- wall @ operation & package room to comply with title 24Details
revision to pa # 2014 0627 9766; remove partition @ kitchen & operations. relocate filing cabinet @ front office & add storage @ package room, remove 3'0" +/- wall @ operation & package room to comply with title 24 | $3,000 | |
| Aug 2, 2013 | Expired or cancelled withdrawn Jan 2015 | 3100 Noriega St | change of use. retain store to restaurant. install vent hood,water meter,& floor drains. remodel bathroom for ada. upgrade electrical panel.Details
change of use. retain store to restaurant. install vent hood,water meter,& floor drains. remodel bathroom for ada. upgrade electrical panel. | $40,000 | |
| Jan 15, 2013 | Completed final sign-off Aug 2014 | 422 21st Av | Western City Construction Co | 1/f enclosed (n) sunroom, (n) family room, (n) bathroom (shower) & (e) laundry room. 2/f add (n) deck. 3/f smoke detectors in all bedrooms.Details
1/f enclosed (n) sunroom, (n) family room, (n) bathroom (shower) & (e) laundry room. 2/f add (n) deck. 3/f smoke detectors in all bedrooms. | $50,000 |
| Dec 21, 2009 | Completed final sign-off Apr 2011 | 739 Commercial St | Hon's Construction Inc. | partitioning walls for office, include lighting, electrical and plumbing and counters. upgrade front entry and restroom for disable access.Details
partitioning walls for office, include lighting, electrical and plumbing and counters. upgrade front entry and restroom for disable access. | $40,000 |