Permit GraphShortlistSan Francisco building permits since 2000

Kristy Fitzgerald

License
C19053
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Arc Interiors, Inc.
On San Francisco permits
Oct 2014 to Apr 2018

3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Integrated Builders Group Inc. (2), Bryan J. Valverde Co

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 9, 2018Never finaled
issued Oct 2018, no final
801 Brannan StBryan J. Valverde Cosuite a: 1st time ti of new exercise bus. in an new building at g/f, includes (1) ada restroom, (2) additional rooms, accoutstic ceilings, hvac distribution from an (e) mech unit, electrical & finishes. tenant is an (e) shell condition which has never been built out previously. sprnkler sep. permit.
Details
Permit
201804095783
Permit issued
Oct 5, 2018

suite a: 1st time ti of new exercise bus. in an new building at g/f, includes (1) ada restroom, (2) additional rooms, accoutstic ceilings, hvac distribution from an (e) mech unit, electrical & finishes. tenant is an (e) shell condition which has never been built out previously. sprnkler sep. permit.

Open the permit page

$120,000
May 19, 2017Completed
final sign-off Jul 2017
851 Van Ness AvIntegrated Builders Group Inc.ti at 1st new cashless branch of the sfbae credit union. new offices and work stations. new vestibule to (e) facade. existing path of travel, ada clearances and restrooms on the 2nd floor are documented under pa 2016-0513-7403
Details
Permit
201705197185
Permit issued
Jun 14, 2017
Final sign-off
Jul 25, 2017

ti at 1st new cashless branch of the sfbae credit union. new offices and work stations. new vestibule to (e) facade. existing path of travel, ada clearances and restrooms on the 2nd floor are documented under pa 2016-0513-7403

Open the permit page

$206,722
Oct 9, 2014Completed
final sign-off Feb 2015
4800 Mission StIntegrated Builders Group Inc.t.i. to include new banking space, and associated support. new atm & awning. new storefront, remodel (e) restroom, install new mechanical system. maher n/a; facade signs under separate permit.
Details
Permit
201410098501
Permit issued
Oct 29, 2014
Final sign-off
Feb 23, 2015

t.i. to include new banking space, and associated support. new atm & awning. new storefront, remodel (e) restroom, install new mechanical system. maher n/a; facade signs under separate permit.

Open the permit page

$291,715