Ronald Campos
- Listed as
- engineer
- Firm
- Klc Consulting Engineers, Inc.
- On San Francisco permits
- Jul 2006 to Jun 2026
8 permits since 2000 (engineer on 8 permits): 3 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 108 Cortland Av | renovation of existing dwelling, add 3 dormers and 297 sf 2nd story rear additon, 19 sf gr fl additon, add 2 baths, removel kitchen/laundry, existing bath. replace front stairs and retaining walls. no change in use, or height. replace existing roofing membrane.Details
renovation of existing dwelling, add 3 dormers and 297 sf 2nd story rear additon, 19 sf gr fl additon, add 2 baths, removel kitchen/laundry, existing bath. replace front stairs and retaining walls. no change in use, or height. replace existing roofing membrane. | $375,000 | |
| Jun 10, 2024 | Completed final sign-off Jun 2025 | 310 Dolores St | Grand Industries Inc | install a new accessible ramp at the courtyard entrance to mission sf de asis church. the expanded restroom building spans the property line between mission sf de asis (block/lot 3566/001) and the existing mission dolores church and museum (block/lot 3566/002) refrence pa# 202209122268Details
install a new accessible ramp at the courtyard entrance to mission sf de asis church. the expanded restroom building spans the property line between mission sf de asis (block/lot 3566/001) and the existing mission dolores church and museum (block/lot 3566/002) refrence pa# 202209122268 | $100,000 |
| Mar 9, 2020 | Never finaled issued Mar 2020, no final | 1774 Oakdale Av | demolish extg stairs and balconies and rebuild them in a not exact replacement rebuild stairs and balconies to current codes. build in kind.Details
demolish extg stairs and balconies and rebuild them in a not exact replacement rebuild stairs and balconies to current codes. build in kind. | $50,000 | |
| Jul 15, 2016 | Completed final sign-off Jan 2025 | 2618 Buchanan St | Damar Construction And Remodeling Inc | construction of new roof deck for existing residential building. construct new interior stairway. n/a for maher ordinance.Details
construction of new roof deck for existing residential building. construct new interior stairway. n/a for maher ordinance. | $40,000 |
| Sep 24, 2014 | Never finaled issued Aug 2015, no final | 910 Bay St | N C M Concrete | soft story retrofit per sfbc chapter 34b other rational design. front i-level shear bracing, 5 reinforced shear walls, 1 shotcrete shear wall (all foundation & collectors).Details
soft story retrofit per sfbc chapter 34b other rational design. front i-level shear bracing, 5 reinforced shear walls, 1 shotcrete shear wall (all foundation & collectors). | $150,000 |
| Apr 29, 2011 | Completed final sign-off Apr 2013 | 143 Collingwood St | Associated Trucking Inc, North South Construction Inc | interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl.Details
interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl. | $85,000 |
| Aug 6, 2008 | Expired or cancelled cancelled Feb 2011 | 143 Collingwood St | Mike Endres Design & Construction | 3rd floor addition and entire remodel, lateral strengthening , ground floor:add new unit w/ bedroom,lvg room,full bath, kitchen, new side entry/stair,new windows,convert crawl space into storage, rear deck/stair. 2nd fl: change front windows to fr doors w/rail, remodel kitchen, new family rm/pwder,Details
3rd floor addition and entire remodel, lateral strengthening , ground floor:add new unit w/ bedroom,lvg room,full bath, kitchen, new side entry/stair,new windows,convert crawl space into storage, rear deck/stair. 2nd fl: change front windows to fr doors w/rail, remodel kitchen, new family rm/pwder, | $100,000 |
| Jul 24, 2006 | Expired or cancelled cancelled Jul 2008 | 367 Munich St | horizontal additioni to rear of building. permit to abate violation 200670034 bid.Details
horizontal additioni to rear of building. permit to abate violation 200670034 bid. | $60,000 |