Kirsten Hanson
- License
- C60667
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C60667 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2022 to Dec 2025
7 permits since 2000 (engineer on 7 permits): 3 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Azul Works, Inc. (3), D-Line Constructors Inc, Earth Sculptures Inc, Lexicon Inc, Total Turf Gold Services Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 6
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 7 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 1 Bristol Ct | D-Line Constructors Inc | modification of (e) private water line which includes installation of (2) 8" pressure reducing valves to help regulate water pressure to the property and individual housing units.Details
modification of (e) private water line which includes installation of (2) 8" pressure reducing valves to help regulate water pressure to the property and individual housing units. | $122,000 |
| Sep 30, 2025 | In progress issued Jun 2026 | 599 Skyline Bl | Earth Sculptures Inc | repair and maintenance of (e) cliff course golf course. reshape/remove bunker, greens, thin trees.Details
repair and maintenance of (e) cliff course golf course. reshape/remove bunker, greens, thin trees. | $200,000 |
| Sep 17, 2025 | In progress issued Nov 2025 | 599 Skyline Bl | Lexicon Inc | repair a maintanance of existing ocean and short golf course. repair and replace green complexes, bunkers and tees.Details
repair a maintanance of existing ocean and short golf course. repair and replace green complexes, bunkers and tees. | $900,000 |
| Oct 12, 2023 | Never finaled issued Nov 2023, no final | 201 Forest Rd | Azul Works, Inc. | yerba buena island project - parcel 4y: an 8-inch reduce pressure principal, assembly (ref bpa# 202102225094)Details
yerba buena island project - parcel 4y: an 8-inch reduce pressure principal, assembly (ref bpa# 202102225094) | |
| Jul 31, 2023 | Completed final sign-off Feb 2025 | 36 Meadow Dr | Azul Works, Inc. | install (2) private fire hydrants, yerba buena island project - parcel 4y & underground fire serviceDetails
install (2) private fire hydrants, yerba buena island project - parcel 4y & underground fire service | $10,000 |
| Jul 31, 2023 | Never finaled issued Aug 2023, no final | 35 Meadow Dr | Azul Works, Inc. | install 3 private fire hydrants-yerba buena island project -parcel 4y: & under ground fire service, from 12" yb rd water main to point of connectionDetails
install 3 private fire hydrants-yerba buena island project -parcel 4y: & under ground fire service, from 12" yb rd water main to point of connection | $15,000 |
| Nov 2, 2022 | Completed final sign-off Aug 2023 | 599 Skyline Bl | Total Turf Gold Services Inc | grading permit application for new part of golf course.Details
grading permit application for new part of golf course. | $900,000 |