Kim Ngo
- Listed as
- architect, designer
- Firm
- Ngo Studio
- Based in
- San Francisco
- On San Francisco permits
- Jul 2021 to Jul 2026
10 permits since 2000 (architect on 9 permits, designer on 1 permit): 6 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 223 Spruce St | Jungsten Construction Inc | dormer additionDetails
dormer addition | $15,000 |
| Jul 6, 2026 | In progress filed Jul 2026, not yet issued | 222 28th Av | excavation and remodel to 1st floor garage level to provide a bedroom, bath and laundry, family room, and garage. remodel (e) kitchen, relocate powder, and relocate stairs to 1st floor on 2nd level. relocate doors at (e) bath and (e) closets on the 3rd floor. replace (e) furnace with ductless miniDetails
excavation and remodel to 1st floor garage level to provide a bedroom, bath and laundry, family room, and garage. remodel (e) kitchen, relocate powder, and relocate stairs to 1st floor on 2nd level. relocate doors at (e) bath and (e) closets on the 3rd floor. replace (e) furnace with ductless mini | $1,000,000 | |
| Jul 25, 2025 | Expired or cancelled expired Aug 2026 | 348 Pope St | remodel to existing bathDetails
remodel to existing bath | $10,000 | |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 2018 42nd Av | Cornerstone Dba Ag Construction | bathroom addition (no change to footprint) in e) garage areaDetails
bathroom addition (no change to footprint) in e) garage area | $20,000 |
| Oct 8, 2024 | Completed final sign-off Aug 2025 | 2042 42nd Av | Cornerstone Dba Ag Construction | interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level.Details
interior remodel to remove internal stair and enclose an external stair. add 2 baths @ lower level. add 1/2 bath at upper level. | $80,000 |
| Mar 7, 2024 | Completed final sign-off Jul 2024 | 1822 18th Av | Kelvin Construction | add (n) bathroom at (e) garage at lower levelDetails
add (n) bathroom at (e) garage at lower level | $20,000 |
| Apr 24, 2023 | Completed final sign-off Jun 2024 | 2441 Greenwich St | Nurture Source Partners Llc, Jungsten Construction Inc | replaceing windows in existing openings @ units 2441 & 2443. provide bird safe glazing per sec 139 sfpc.Details
replaceing windows in existing openings @ units 2441 & 2443. provide bird safe glazing per sec 139 sfpc. | $350,000 |
| Mar 10, 2023 | Completed final sign-off Dec 2023 | 1932 Ortega St | Cornerstone Dba Ag Construction | interior remodel to provide interior stairs and relocate kitchen, remove existing exterior stair and extend deck.Details
interior remodel to provide interior stairs and relocate kitchen, remove existing exterior stair and extend deck. | $140,000 |
| Sep 13, 2022 | Completed final sign-off Dec 2022 | 3070 Market St | Cornerstone Dba Ag Construction | demo half bath, new full bath shower pan. replace kitchen cabinetsDetails
demo half bath, new full bath shower pan. replace kitchen cabinets | $10,000 |
| Jul 15, 2021 | Never finaled issued Jul 2021, no final | 9 Edgar Av | remove (e) bath, new wet bar @ ground flDetails
remove (e) bath, new wet bar @ ground fl | $6,000 |