Kevin L. Fuller
- License
- C28634
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Oct 2011 to Dec 2016
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nieto Valle Construction (2), Design Line Construction, Klep Construction Inc.
- Engineers
- Tek Pe (2), Jahandar Jadegar
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 235 Buchanan St | Nieto Valle Construction | s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f.soft story retrofit program per sfbc ch 34b,vinstall steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Dec 29, 2016 | Completed final sign-off Apr 2018 | 295 Buchanan St | Nieto Valle Construction | s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4.Details
s.f. soft story retrofit program sfbc ch 34b, install steel moment frame & plywood shear panels. 2012 iebc appendix a-4. | $34,800 |
| Aug 24, 2015 | Completed final sign-off Dec 2015 | 1806 Great Hy | Klep Construction Inc. | install interior partitions, fixtures & finishes for new ground floor bathroom.Details
install interior partitions, fixtures & finishes for new ground floor bathroom. | $6,200 |
| Oct 24, 2011 | Completed final sign-off Feb 2013 | 66 Potomac St | Design Line Construction | revision to pa# 2010/05/14/2529-s/r3. revisions include designation of new 3rd floor level. interior layout, structural revisions & clarification of total number of stories from (e)2 stories & basement/garage to 3 stories & basement/garageDetails
revision to pa# 2010/05/14/2529-s/r3. revisions include designation of new 3rd floor level. interior layout, structural revisions & clarification of total number of stories from (e)2 stories & basement/garage to 3 stories & basement/garage |