Keveh Rad
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Kaveh Rad
- Based in
- Oakland
- On San Francisco permits
- Feb 2002 to Aug 2023
16 permits since 2000 (engineer on 14 permits, architect on 1 permit, authorized agent-others on 1 permit): 14 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2023 | Completed final sign-off May 2025 | 464 Douglass St | William Gregory Clause | remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st).Details
remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st). | $160,000 |
| Aug 4, 2023 | Completed final sign-off Dec 2024 | 464 Douglass St | William Gregory Clause | facade refresh only - remove and replace stucco, new architectual elements as shown on plan, new windows, trim. all within property lines.Details
facade refresh only - remove and replace stucco, new architectual elements as shown on plan, new windows, trim. all within property lines. | $85,000 |
| Mar 25, 2021 | Never finaled issued Jun 2021, no final | 1701 Franklin St | Dylan Arrants Construction | kitchen remodel and shear wall alteration.Details
kitchen remodel and shear wall alteration. | $20,000 |
| Feb 26, 2020 | Completed final sign-off Jun 2021 | 3020 Fillmore St | ground level structural work; voluntary structural strengthening of lower floor.Details
ground level structural work; voluntary structural strengthening of lower floor. | $8,000 | |
| Jul 12, 2019 | Completed final sign-off Nov 2019 | 98 Ney St | replace (e) retaining wall to comply with nov 201814921.Details
replace (e) retaining wall to comply with nov 201814921. | $25,000 | |
| May 15, 2019 | Completed final sign-off Jun 2019 | 1430 Clay St | K. Kinahan Construction | soft story retrofit: revision to app#201707061117 1) added door in garage shear wall. 2)add simpson shearwall at front. 3) dbl sided shearwall at rear of garage in lieu of adjacent shearwall at storage rm. 4)relocated shr ply from meter area to adjacent garage wall.Details
soft story retrofit: revision to app#201707061117 1) added door in garage shear wall. 2)add simpson shearwall at front. 3) dbl sided shearwall at rear of garage in lieu of adjacent shearwall at storage rm. 4)relocated shr ply from meter area to adjacent garage wall. | |
| Aug 29, 2018 | Completed final sign-off Oct 2020 | 155 Fair Oaks St | K. Kinahan Construction | mandatory soft story seismic work; sfebc chapter 4d; app a4.Details
mandatory soft story seismic work; sfebc chapter 4d; app a4. | $30,000 |
| Aug 24, 2017 | Completed final sign-off Mar 2019 | 1750 Washington St | Kinstan Home Solutions Inc. | soft story seismic retrofit pre sfebc ch 4d, 2016 cebc a4Details
soft story seismic retrofit pre sfebc ch 4d, 2016 cebc a4 | $85,000 |
| Jul 6, 2017 | Completed final sign-off Mar 2019 | 744 Guerrero St | K. Kinahan Construction | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 | $40,000 |
| Jul 6, 2017 | Completed final sign-off Aug 2018 | 2528 Washington St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $30,000 | |
| Jul 6, 2017 | Completed final sign-off Jun 2019 | 1430 Clay St | K. Kinahan Construction | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 | $50,000 |
| Oct 14, 2016 | Never finaled issued Aug 2017, no final | 172 Beaumont Av | Kalix Inc Dbalara Construction, H Y Construction Inc. | gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony &Details
gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony & | $410,000 |
| May 19, 2014 | Completed final sign-off Sep 2014 | 2648 Gough St | soft story retrofit per sfbc chapter 34b, calc method 1613 s.f. bldg code.Details
soft story retrofit per sfbc chapter 34b, calc method 1613 s.f. bldg code. | $35,000 | |
| Apr 17, 2013 | Completed final sign-off May 2014 | 3024 Fillmore St | voluntary soft story seismic upgrade per ab-094.Details
voluntary soft story seismic upgrade per ab-094. | $45,000 | |
| Apr 17, 2013 | Completed final sign-off Apr 2014 | 3024 Fillmore St | replace bathroom. new front door. remove one bearing wall and provide beam and post system.Details
replace bathroom. new front door. remove one bearing wall and provide beam and post system. | $12,500 | |
| Feb 15, 2002 | Completed final sign-off Apr 2002 | 289 Castro St | repair (e) exterior stairs per novDetails
repair (e) exterior stairs per nov | $15,000 |