Justin Cipriani
- License
- 28651
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Toby Long Design
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Apr 2010
6 permits since 2000 (architect on 6 permits): 3 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Aidan Fahy Constr. Inc. (2)
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2010 | Never finaled issued Dec 2010, no final | 111 Hoffman Av | interior remodel: interior partitions to be modified, new electrical & plumbing. new windows & doors in rear of house on basement level only. rear deck & stairs under seperate permitDetails
interior remodel: interior partitions to be modified, new electrical & plumbing. new windows & doors in rear of house on basement level only. rear deck & stairs under seperate permit | $200,000 | |
| Sep 12, 2008 | Completed final sign-off Jan 2010 | 52 Prentiss St | revision to pa# 2005/06/23/5954 to change structural framing system structural insulated panels to stud framing.Details
revision to pa# 2005/06/23/5954 to change structural framing system structural insulated panels to stud framing. | ||
| Sep 12, 2008 | Completed final sign-off Jan 2010 | 64 Prentiss St | revision to pa# 2005/06/23/5948 to change structural framing system structural insulated panels to stud framing.Details
revision to pa# 2005/06/23/5948 to change structural framing system structural insulated panels to stud framing. | ||
| Jun 23, 2005 | Completed final sign-off Apr 2007 | 64 Prentiss St | to demolish 2 story single family dwelling.Details
to demolish 2 story single family dwelling. | ||
| Jun 23, 2005 | Expired or cancelled expired Jan 2010 | 64 Prentiss St | Aidan Fahy Constr. Inc. | to erect 2 story, single family dwelling.Details
to erect 2 story, single family dwelling. | $420,000 |
| Jun 23, 2005 | Expired or cancelled expired Jan 2010 | 52 Prentiss St | Aidan Fahy Constr. Inc. | to erect 2 story, single family dwelling.Details
to erect 2 story, single family dwelling. | $380,000 |