Reem Avrahami
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Brother & Brother Builders
- Based in
- San Jose
- On San Francisco permits
- Mar 2017 to Nov 2025
17 permits since 2000 (contractor on 16 permits, authorized agent-others on 4 permits, pmt consultant/expediter on 1 permit): 11 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2025 | In progress issued Nov 2025 | 258 Cumberland St | Brother & Brother Builders | recommencement and completion of work approved under pa 201703151554.Details
recommencement and completion of work approved under pa 201703151554. | $300,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 258 Cumberland St | Brother & Brother Builders | recommencement and conpletion of work approved under 202305167872.Details
recommencement and conpletion of work approved under 202305167872. | $60,000 |
| Oct 12, 2023 | Completed final sign-off Sep 2024 | 1057 Prague St | Brother & Brother Builders | expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal.Details
expand/remodel kitchen on 2/f, structural strengthening to compensate for wall removal. | $60,000 |
| May 16, 2023 | Never finaled issued Jun 2023, no final | 258 Cumberland St | Brother & Brother Builders | revision to pa#201703151554. for conditional use application to address sf planning complaint #2021-0003487 enf for additional demo resulting from field conditionDetails
revision to pa#201703151554. for conditional use application to address sf planning complaint #2021-0003487 enf for additional demo resulting from field condition | $20,000 |
| May 6, 2021 | Completed final sign-off Jul 2021 | 28 Montcalm St | Brother & Brother Builders | in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp.Details
in-kind kitchen remodel (no change to the floor or walls) like for like. replacing everything in the same locatoins. subpanel replacements 125a to 125a,mp. | $25,000 |
| May 3, 2021 | Never finaled issued May 2021, no final | 39 Progress St | Brother & Brother Builders | master bathroom remodel. tub to shower. remove existing shower and leave a closet instead. replace toilet & vanity. add 2 recessed lights.Details
master bathroom remodel. tub to shower. remove existing shower and leave a closet instead. replace toilet & vanity. add 2 recessed lights. | $25,000 |
| Mar 25, 2021 | Completed final sign-off Feb 2022 | 3347 Divisadero St | Brother & Brother Builders | in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting.Details
in-kind kitchen & (3) bathroom remodel, no change to floor plan/walls, like-for-like, all same locations, add recessed lighting. | $55,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2021 | 260 King St | Brother & Brother Builders | unit #425: complete bathroom remodel like-for-likeDetails
unit #425: complete bathroom remodel like-for-like | $25,000 |
| Feb 8, 2021 | Completed final sign-off May 2021 | 141 St Marys Av | Brother & Brother Builders | in kind bathroom remodel no change to the floor plan or walls. hallway bathroom. like to like, replacing everything in the same locations. add 2 led lights.Details
in kind bathroom remodel no change to the floor plan or walls. hallway bathroom. like to like, replacing everything in the same locations. add 2 led lights. | $25,000 |
| Dec 23, 2020 | Completed final sign-off May 2022 | 1966 Pacific Av | Direct Home Remodeling Inc | unit #203: kitchen, master bathroom, hallway bathroom, and laundry toom remodel. sub-panel upgrade, and non-bearing wall removal.Details
unit #203: kitchen, master bathroom, hallway bathroom, and laundry toom remodel. sub-panel upgrade, and non-bearing wall removal. | $56,000 |
| Oct 29, 2020 | Completed final sign-off Aug 2021 | 838 Darien Wy | Brother & Brother Builders | stucco repair at rear and sides of the house. non street visible.Details
stucco repair at rear and sides of the house. non street visible. | $25,000 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 25 Camp St | Brother & Brother Builders | in-kind bathroom remodel. no change to plan or walls. like for like. replacing everything at same locations. add 3 recessed lights.Details
in-kind bathroom remodel. no change to plan or walls. like for like. replacing everything at same locations. add 3 recessed lights. | $22,775 |
| Aug 11, 2020 | Completed final sign-off Aug 2021 | 838 Darien Wy | Brother & Brother Builders | stucco repair @ front of the house. stucco only.Details
stucco repair @ front of the house. stucco only. | $25,000 |
| Jun 25, 2020 | Completed final sign-off Dec 2020 | 5810 Mission St | Brother & Brother Builders | bathroom remodel. like for like. replacing tub, vanity, toilet, and fan. add 3 led lights.Details
bathroom remodel. like for like. replacing tub, vanity, toilet, and fan. add 3 led lights. | $15,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 100 Beaumont Av | Brother & Brother Builders | unit a: bathroom remodel, like-for-like, 7'x8', no framing/altered, new plumbing/electrical/fixture updateDetails
unit a: bathroom remodel, like-for-like, 7'x8', no framing/altered, new plumbing/electrical/fixture update | $4,500 |
| Jun 12, 2018 | Expired or cancelled cancelled Jul 2026 | 680 Los Palmos Dr | Brother & Brother Builders | horizontal addition. at 2/fl: extend (e) faily room & add closet. at 3/fl: add 2 (n) bedrooms, (n) bath and (n) laundry and interior remodel.Details
horizontal addition. at 2/fl: extend (e) faily room & add closet. at 3/fl: add 2 (n) bedrooms, (n) bath and (n) laundry and interior remodel. | $80,000 |
| Mar 15, 2017 | Never finaled issued Jun 2019, no final | 258 Cumberland St | Brother & Brother Builders | horizontal & vertical additions to an existing 2-story single family dwelling. add 2 bedrooms & 3 bathrooms.Details
horizontal & vertical additions to an existing 2-story single family dwelling. add 2 bedrooms & 3 bathrooms. | $200,000 |