Joshua Kardon
- License
- 2305
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Joshua B. Kardon & Co.
- Based in
- Berkeley
- On San Francisco permits
- Sep 2005 to Jun 2025
9 permits since 2000 (engineer on 8 permits, architect on 1 permit): 7 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Moroso Construction Inc (3), Boaz Mor Design & Construction, G-Max Construction, Reinhardt Construction Solutions Llc
- Architects
- Lawrence B Kapp, Stephen R. Cuddy, William Hansell
- Engineers
- Lawrence B. Karp
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 5
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 44 San Antonio Pl | Reinhardt Construction Solutions Llc | revision to pa # 202505287406: change 1/s2, 3/s2, 4/s2 to 1/sk2, 1/sk3, 1/sk4 from pipe column foundation to footing with wall. original permit for broken joist repairs.Details
revision to pa # 202505287406: change 1/s2, 3/s2, 4/s2 to 1/sk2, 1/sk3, 1/sk4 from pipe column foundation to footing with wall. original permit for broken joist repairs. | $3,000 |
| May 23, 2023 | Expired or cancelled withdrawn Jun 2023 | 742 Castro St | Boaz Mor Design & Construction | revision to ba#202103227029, add 4¿ concrete to foundation at north property line to replace existing undermined foundation and new retaining wall to support existing unsupported soil cut in crawl space.Details
revision to ba#202103227029, add 4¿ concrete to foundation at north property line to replace existing undermined foundation and new retaining wall to support existing unsupported soil cut in crawl space. | |
| May 3, 2011 | Completed final sign-off Sep 2012 | 2175 Green St | strengthening and underpinning by adding grade beam supports and piers.Details
strengthening and underpinning by adding grade beam supports and piers. | $100,000 | |
| Feb 17, 2011 | Completed final sign-off Jan 2013 | 4000 Mission St | disconnect washers (plumb/elec), demo floor, perform structural repairs to support floor/washers. approx 100sfDetails
disconnect washers (plumb/elec), demo floor, perform structural repairs to support floor/washers. approx 100sf | $20,000 | |
| Jan 13, 2009 | Completed final sign-off Apr 2009 | 165 Duncan St | G-Max Construction | addition of new wood deck & stairs to rear side of the residence accessing backyard.Details
addition of new wood deck & stairs to rear side of the residence accessing backyard. | $32,500 |
| Apr 3, 2007 | Completed final sign-off Oct 2007 | 2290 Vallejo St | Moroso Construction Inc | replace (e) fence in rear with retaining wall and new fence.Details
replace (e) fence in rear with retaining wall and new fence. | $18,000 |
| Jan 16, 2007 | Completed final sign-off Feb 2008 | 2290 Vallejo St | Moroso Construction Inc | revision to approved appl# 200509304428 foudnation revision and beam replacement at first floor of 4 revisions.Details
revision to approved appl# 200509304428 foudnation revision and beam replacement at first floor of 4 revisions. | $40,000 |
| Dec 21, 2005 | Completed final sign-off Aug 2006 | 1020 Union St | windscreen 3/8" clear safety tempered panels supported by vertical & horizontal steel supports, install on existing parapet walls 22'2" west/east,13'11" north/south each glass panel appx 54-56" long, each at 42" high steel stawchions (vertical) steel (tube) horizontalDetails
windscreen 3/8" clear safety tempered panels supported by vertical & horizontal steel supports, install on existing parapet walls 22'2" west/east,13'11" north/south each glass panel appx 54-56" long, each at 42" high steel stawchions (vertical) steel (tube) horizontal | $10,000 | |
| Sep 30, 2005 | Expired or cancelled expired Feb 2008 | 2290 Vallejo St | Moroso Construction Inc | foundation work @basement,new framing @basement & 1/f,new windows,doors @rear facade.new interior finishes,electrical & plumbing @basement & 1/f,replace plaster & windows & doors on facadeDetails
foundation work @basement,new framing @basement & 1/f,new windows,doors @rear facade.new interior finishes,electrical & plumbing @basement & 1/f,replace plaster & windows & doors on facade | $135,000 |