Joseph Scott
- Listed as
- engineer
- On San Francisco permits
- Aug 2023 to Aug 2023
2 permits since 2000 (engineer on 2 permits): 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2023 | Never finaled issued Sep 2023, no final | 1201 08th St | Burns & Mc Donnell | change of use from (e) 34 space private parking lot to a 23 space private fleet charging parking lot. (e) curb cuts to remain. no change in vehicular entries or exits. all work within property line. install (n) medium voltage switch gear, charging containers, dual port dispensers, associated conduitDetails
change of use from (e) 34 space private parking lot to a 23 space private fleet charging parking lot. (e) curb cuts to remain. no change in vehicular entries or exits. all work within property line. install (n) medium voltage switch gear, charging containers, dual port dispensers, associated conduit | $68,580 |
| Aug 8, 2023 | In progress issued Oct 2023 | 485 Irwin St | Burns & Mc Donnell | change of use from existing 74 space private parking lot to a s2 space private fleet charging use. existing curb cuts to remain, no change in vehicular entries or exist. all work w/in property line. install new medium voltage switchgear, charging containers, dual port dispensers and associatedDetails
change of use from existing 74 space private parking lot to a s2 space private fleet charging use. existing curb cuts to remain, no change in vehicular entries or exist. all work w/in property line. install new medium voltage switchgear, charging containers, dual port dispensers and associated | $356,620 |