Joseph Arleo
- Listed as
- architect, authorized agent-others
- Firm
- Arleo Architects Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Nov 2019
12 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit): 9 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 27, 2019 | Expired or cancelled withdrawn Nov 2022 | 701 Haight St | remodel of existing bar/restaurant. relocation/reconfiguration of bar & seated patron area. creation of compliant 2nd exit at existing door. new finishes & floor surface upgrades to basement stair.Details
remodel of existing bar/restaurant. relocation/reconfiguration of bar & seated patron area. creation of compliant 2nd exit at existing door. new finishes & floor surface upgrades to basement stair. | $194,000 | |
| Nov 27, 2018 | Completed final sign-off Sep 2019 | 742 Valencia St | Upcycle Builders Inc. | remodel of extg restaurant/bar, relocate kitchen, new finishes, remove extg awning.Details
remodel of extg restaurant/bar, relocate kitchen, new finishes, remove extg awning. | $200,000 |
| Sep 27, 2018 | Completed final sign-off Apr 2019 | 742 Valencia St | Upcycle Builders Inc. | soft demo including removal of non load bearing partitions, wall finishes, floor finishes, equip, fixtures, cabinets, countersDetails
soft demo including removal of non load bearing partitions, wall finishes, floor finishes, equip, fixtures, cabinets, counters | $10,000 |
| Sep 13, 2018 | Completed final sign-off May 2019 | 25 Burnett Av | Bay Heating & Air Conditining Inc | add air conditioning lounge, kitchen, dining room & master bedroom. revision to app #201606210527.Details
add air conditioning lounge, kitchen, dining room & master bedroom. revision to app #201606210527. | $15,000 |
| Sep 27, 2017 | Completed final sign-off May 2019 | 25 Burnett Av | Blair Burke General Contractors Inc | reference pa #201606210527. rear exterior deck addition at lower level. rev approved rear deck stairs, went through 311, back in scope work. deck stairs less than 10" above grade. replace e clad windows in kind. mirnor revision to new entry layout, new stair to grade.Details
reference pa #201606210527. rear exterior deck addition at lower level. rev approved rear deck stairs, went through 311, back in scope work. deck stairs less than 10" above grade. replace e clad windows in kind. mirnor revision to new entry layout, new stair to grade. | $50,000 |
| Jul 14, 2017 | Completed final sign-off Mar 2020 | 1604 Treat Av | Momentum Builders Sf Inc, S & K Construction | convert (e) storage to adu per ord. no 162-16.Details
convert (e) storage to adu per ord. no 162-16. | $95,000 |
| Jun 21, 2016 | Completed final sign-off May 2019 | 25 Burnett Av | Blair Burke General Contractors Inc | enclose entry court @ main level (add 114 sq.ft). remove (e) shingles & replace with rainscreen panels. replace windows @ south facade. modify roof curb. replace / expand deck & stair @ rear yard. replace gates @ sideyards.Details
enclose entry court @ main level (add 114 sq.ft). remove (e) shingles & replace with rainscreen panels. replace windows @ south facade. modify roof curb. replace / expand deck & stair @ rear yard. replace gates @ sideyards. | $75,000 |
| Apr 28, 2016 | Expired or cancelled cancelled Sep 2017 | 621 Elizabeth St | 885 sf (3) story stepped horizontal addition at rear of (e)2,770 sf (3) story single family residence. partial excavation @ ground floor, reconfiguration of 2nd & 3rd floors, cosmetic improvement repair at front facade + patio/landscape at rear yard.Details
885 sf (3) story stepped horizontal addition at rear of (e)2,770 sf (3) story single family residence. partial excavation @ ground floor, reconfiguration of 2nd & 3rd floors, cosmetic improvement repair at front facade + patio/landscape at rear yard. | $290,000 | |
| Mar 29, 2016 | Completed final sign-off Jun 2016 | 105 Steiner St | Eco Logic Construction & Design Inc. | kitchen and bath remodel at (e) 3rd fl unit 105 onlyDetails
kitchen and bath remodel at (e) 3rd fl unit 105 only | $30,000 |
| Jun 11, 2015 | Completed final sign-off Feb 2016 | 285 Cumberland St | Blair Burke General Contractors Inc | 1) 3rd floor remodel: add one new bathroom. 2)add two new skylights. 3)replace extg comp. shingle roof.Details
1) 3rd floor remodel: add one new bathroom. 2)add two new skylights. 3)replace extg comp. shingle roof. | $125,000 |
| Jun 17, 2008 | Expired or cancelled expired Dec 2011 | 30 Winfield St | 3rd floor addition-enclose space below (e) 2nd floor deck, general interior remodel, add hydrolic car lift at (e) garage.Details
3rd floor addition-enclose space below (e) 2nd floor deck, general interior remodel, add hydrolic car lift at (e) garage. | $200,000 | |
| Mar 18, 2005 | Completed final sign-off Dec 2005 | 120 Belgrave Av | C R Construction Co Inc | kitchen,bathroom&lower level remodel-add bedroom,move bathroom.minor remodel upper level bedroom.Details
kitchen,bathroom&lower level remodel-add bedroom,move bathroom.minor remodel upper level bedroom. | $95,000 |