Jones Alex Bernell

License
885548
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Three Brothers Electrical
Based in
San Francisco
On San Francisco permits
Feb 2019 to Feb 2019

2 permits since 2000 (authorized agent-others on 1 permit, contractor on 1 permit): 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Wickman Development And Construction (2)
Engineers
Antonio Jacksalem (2), Meng Hsiu Chen (2)

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Feb 11, 2019Completed
final sign-off Jun 2022
201 Williams AvThree Brothers Electrical, Wickman Development And Constructionremove existing (outdoor) generator. replace with new generator, day tank and fuel pumps.
Details
Permit
201901150418
Permit issued
Aug 22, 2019
Final sign-off
Jun 23, 2022

remove existing (outdoor) generator. replace with new generator, day tank and fuel pumps.

Open the permit page

$51,000
Feb 11, 2019Completed
final sign-off Sep 2020
301 Eddy StWickman Development And Constructionremove existing generator. install new generator, fuel vent lines and remote fuel port.
Details
Permit
201901150413
Permit issued
May 1, 2019
Final sign-off
Sep 23, 2020

remove existing generator. install new generator, fuel vent lines and remote fuel port.

Open the permit page

$48,000