John Taft
- License
- C26193
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Backen & Backen
- Based in
- St Helena
- On San Francisco permits
- Aug 2024 to Apr 2026
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Building Inc. (3)
- Engineers
- David Johnson, Ivano Russo
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 27, 2026 | Completed final sign-off Aug 2026 | 468 Jackson St | Centric Building Inc. | interior ti to immersion room and studio rooms 1 and 2, lighting and fixtures.Details
interior ti to immersion room and studio rooms 1 and 2, lighting and fixtures. | $30,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 472 Jackson St | Centric Building Inc. | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades. mep deferred | $300,000 |
| Aug 19, 2024 | Completed final sign-off Apr 2026 | 468 Jackson St | Centric Building Inc. | interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferredDetails
interior layout of existing historic building to provide showroom, offices and amenities for staff. connect adjaccent buildings on 1st flr and provide ada bathroom upgrades, add new lula elevator. mep deferred | $400,000 |