John Swain
- Listed as
- architect, engineer
- Firm
- Buel Engineering
- On San Francisco permits
- Jul 2008 to Nov 2023
2 permits since 2000 (architect on 1 permit, engineer on 1 permit): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 6, 2023 | In progress issued Jul 2024 | 570 Belvedere St | Thomas Design Construction | interior remodel of level 1 kitchen, level 2 master bedroom and level 2 shared bathroom. 45sf addition to master bedroom. new master bedroom added. deck and master bedroom roof at rear. exterior renovations include dedmo and replacement of windows, doors, deck, and master bedroom.Details
interior remodel of level 1 kitchen, level 2 master bedroom and level 2 shared bathroom. 45sf addition to master bedroom. new master bedroom added. deck and master bedroom roof at rear. exterior renovations include dedmo and replacement of windows, doors, deck, and master bedroom. | $450,000 |
| Jul 15, 2008 | Completed final sign-off Oct 2011 | 660 Los Palmos Dr | kitchen remodel, move (e) bath, add full bath, move (e) walls @dining rm, move (e) wall @bedrm, repl windows/doors, raise (e) deck, add guardrail @upper fl. install gas fireplace, expand storage platform in garage, remove sloped roof @nw cornerDetails
kitchen remodel, move (e) bath, add full bath, move (e) walls @dining rm, move (e) wall @bedrm, repl windows/doors, raise (e) deck, add guardrail @upper fl. install gas fireplace, expand storage platform in garage, remove sloped roof @nw corner | $200,000 |