John Moe
- License
- 10448
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Ferrari Moe, Llp
- On San Francisco permits
- Apr 2007 to Sep 2016
3 permits since 2000 (architect on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bushert Construction Inc., Cahill Contractors Inc, Occidental Express
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2016 | Expired or cancelled cancelled Aug 2019 | 3009 Sacramento St | Bushert Construction Inc. | rear building. unit legalization ord 43-14. existed prior to 1950. previously converted to illegal studio unit.Details
rear building. unit legalization ord 43-14. existed prior to 1950. previously converted to illegal studio unit. | $10,000 |
| Mar 22, 2016 | Completed final sign-off Sep 2016 | 1615 Sutter St | Cahill Contractors Inc | there are several leaks on the east elevation. the existing plaster assembly will be removed and replaced with a new cement plaster system.Details
there are several leaks on the east elevation. the existing plaster assembly will be removed and replaced with a new cement plaster system. | $600,000 |
| Apr 23, 2007 | Completed final sign-off Nov 2007 | 867 Ashbury St | Occidental Express | restoring of deteriorated front stairs and rails and replace 2 aluminum windws with woodDetails
restoring of deteriorated front stairs and rails and replace 2 aluminum windws with wood | $18,500 |