John Ehlert
- Listed as
- architect, engineer
- Firm
- Jr Structural Engineering Inc
- Based in
- Pleasanton
- On San Francisco permits
- Jan 2019 to Sep 2026
17 permits since 2000 (engineer on 16 permits, architect on 1 permit): 9 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 2879 California St | Belfor Usa Group Inc | work outline in these is related to the damage to the roof above the master bedroom walk in closet due to fallen debris from adjacent property. all work will be completed to return the house to original conditoins, with like for like approach, including repair of 3 damaged roof trusses.Details
work outline in these is related to the damage to the roof above the master bedroom walk in closet due to fallen debris from adjacent property. all work will be completed to return the house to original conditoins, with like for like approach, including repair of 3 damaged roof trusses. | $5,000 |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 1570 33rd Av | relocate to fire damaged repair to house including interior finishes, repair, windows and doors and electrical work. all work will be like for like.Details
relocate to fire damaged repair to house including interior finishes, repair, windows and doors and electrical work. all work will be like for like. | $80,000 | |
| May 21, 2026 | In progress issued Jun 2026 | 305 Hyde St | Blu Sky Restoration Contractors Llc | fire at unit 604 and spred to units 605, 504 and 202. all work will be completed to return each affected unit to orig conditions incl the removal and repl of fire damaged gyp, interior finishes, plumbing, electrical, windows and doors to comply with nov202428667. all work in-kind.Details
fire at unit 604 and spred to units 605, 504 and 202. all work will be completed to return each affected unit to orig conditions incl the removal and repl of fire damaged gyp, interior finishes, plumbing, electrical, windows and doors to comply with nov202428667. all work in-kind. | $250,000 |
| Dec 24, 2025 | In progress issued Jan 2026 | 417 Hyde St | Blu Sky Restoration Contractors Llc | unit #7: r/r fire damaged inteiror finishes, windows, electrical, plumbing, ceiling/roof framing and roof materials. unit #5: r/r fire/water damaged interior finishes. all work to return building to original conditions. to comply with nov202542537Details
unit #7: r/r fire damaged inteiror finishes, windows, electrical, plumbing, ceiling/roof framing and roof materials. unit #5: r/r fire/water damaged interior finishes. all work to return building to original conditions. to comply with nov202542537 | $150,000 |
| Apr 1, 2025 | Completed final sign-off Mar 2026 | 625 Taylor St | Blu Sky Restoration Contractors Llc | work in unit 200 only. remove and replace fire and smoke damaged interior finishes and wiring. remove and replace 1 damaged window. remove and replace wall heater.Details
work in unit 200 only. remove and replace fire and smoke damaged interior finishes and wiring. remove and replace 1 damaged window. remove and replace wall heater. | $56,000 |
| Aug 5, 2024 | Expired or cancelled withdrawn Dec 2024 | 2461 21st Av | B M S Cat Llc | rear bldg - revise pa 202109077893 to remove electrical work that was shown on the drawings associated with pa. no work proposed or authorizedDetails
rear bldg - revise pa 202109077893 to remove electrical work that was shown on the drawings associated with pa. no work proposed or authorized | |
| Jul 3, 2024 | In progress issued Feb 2025 | 207 14th Av | Raymond Peng Construction | to comply w/nov 202303712. repair fire damge at all 3 floors. remove and replace all drywall, insulation, electrical & plumbing fixtures. remove and replace all fire damaged windows, doors, exterior finishes, roof and roofing materials. a portion of the roof framing and the entire exterior stairsDetails
to comply w/nov 202303712. repair fire damge at all 3 floors. remove and replace all drywall, insulation, electrical & plumbing fixtures. remove and replace all fire damaged windows, doors, exterior finishes, roof and roofing materials. a portion of the roof framing and the entire exterior stairs | $900,000 |
| Jun 6, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | unit 2 - fire/smoke/water damage repair. drywall, cabinets, bathtub, sinks like for like. no exterior workDetails
unit 2 - fire/smoke/water damage repair. drywall, cabinets, bathtub, sinks like for like. no exterior work | $200,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | #6: fire/smoke/water damage repair to 3rd fl unit 6. like for like. drywall cabinets, bathtub, sinksDetails
#6: fire/smoke/water damage repair to 3rd fl unit 6. like for like. drywall cabinets, bathtub, sinks | $200,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | unit 5: fire/smoke/water damage repair to 3rd fl unit 5. like for like. drywall cabinets, bathtub, sinksDetails
unit 5: fire/smoke/water damage repair to 3rd fl unit 5. like for like. drywall cabinets, bathtub, sinks | $200,000 |
| Jun 8, 2023 | Never finaled filed Jun 2023, never issued | 1211 Fitzgerald Av | to comply w/202295142 scope of work is to repair fire damage that started at the neighboring home (1215 fitzgerald) and spred to the upper floor kitchen area of this home. repairs to roofing, roof/ceiling/wall framing, full rewire of upper floor only. full gut of upper floor only.Details
to comply w/202295142 scope of work is to repair fire damage that started at the neighboring home (1215 fitzgerald) and spred to the upper floor kitchen area of this home. repairs to roofing, roof/ceiling/wall framing, full rewire of upper floor only. full gut of upper floor only. | $95,000 | |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 2634 Judah St | Jon K Takata Corp Dba Restoration Mgmt | unit #4: to comply w/nov 20228803. repair fire damage, like for like approach. repairs include damaged wall/ ceiling/ roof framing at the rear corner of the living room, damaged gyp/insulatiion/electrical fixtures in living rm, hallway, partial at bedroom and partiial kitchen replacement.Details
unit #4: to comply w/nov 20228803. repair fire damage, like for like approach. repairs include damaged wall/ ceiling/ roof framing at the rear corner of the living room, damaged gyp/insulatiion/electrical fixtures in living rm, hallway, partial at bedroom and partiial kitchen replacement. | $115,000 |
| Dec 7, 2021 | Completed final sign-off Aug 2024 | 200 Ellsworth St | B M S Cat Llc | revision to pa 202107083454 keeping teh concrete slab; not replacing the elctrical panel and no installation of window (not visible from street)Details
revision to pa 202107083454 keeping teh concrete slab; not replacing the elctrical panel and no installation of window (not visible from street) | |
| Jun 29, 2021 | Expired or cancelled withdrawn Oct 2022 | 2315 17th Av | North Point Construction And Restoration | legalization of the lower floor unit. ledu under ord#43-14. separate pa for fire damage nov.Details
legalization of the lower floor unit. ledu under ord#43-14. separate pa for fire damage nov. | $80,000 |
| Jun 12, 2020 | Completed final sign-off Aug 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov # 202036301. repair fire damage caused to the bar located on ground floor of this mixed-use property to return it to its original condition using a like-for-like 00....Details
to comply with nov # 202036301. repair fire damage caused to the bar located on ground floor of this mixed-use property to return it to its original condition using a like-for-like 00.... | $300,000 |
| May 19, 2020 | Completed final sign-off Feb 2023 | 3150 18th St | Sharjo Inc. Dba Service Master Restorati | the work outlined in these plans is related to the repairs of vent holes through fire rated assemblies and shear plywood to allow for moisture due to water damage to vent out. all repair work will be complete to return the commercial building to original conditions including installation of plywoodDetails
the work outlined in these plans is related to the repairs of vent holes through fire rated assemblies and shear plywood to allow for moisture due to water damage to vent out. all repair work will be complete to return the commercial building to original conditions including installation of plywood | $90,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 81 Ellsworth St | American Technologies Inc | repair partial exterior framing wall damaged by vehicle impact and dry wall work. to comply with nov 201805301 to replace in kind - wood siding to match. replace garage door with like for like wood door.Details
repair partial exterior framing wall damaged by vehicle impact and dry wall work. to comply with nov 201805301 to replace in kind - wood siding to match. replace garage door with like for like wood door. | $18,500 |