Permit GraphShortlistSan Francisco building permits since 2000

Jiwon Jung

License
C89281
Look the license up with the state
Listed as
engineer
On San Francisco permits
Aug 2022 to Sep 2024

13 permits since 2000 (engineer on 13 permits): 8 completed, 2 in progress, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 5, 2024In progress
filed Sep 2024, not yet issued
300 Grant Avnew ramp addition for retail space. apply new wall finishes. no exterior (facade) work
Details
Permit
202409050165
Status
filed
Filed
Sep 5, 2024
Declared cost
$75,000
Address
300 Grant Av

new ramp addition for retail space. apply new wall finishes. no exterior (facade) work

Open the permit page

$75,000
Jan 31, 2024Completed
final sign-off Feb 2025
300 Grant AvKukbo Design Usa Llc5/f:deferred submittal of mechanical, electrical & plumbing work only. ref ti pa# 202311150842.
Details
Permit
202401314984
Status
complete
Filed
Jan 31, 2024
Permit issued
Jun 13, 2024
Final sign-off
Feb 10, 2025
Declared cost
$600,000
Address
300 Grant Av

5/f:deferred submittal of mechanical, electrical & plumbing work only. ref ti pa# 202311150842.

Open the permit page

$600,000
Dec 13, 2023In progress
filed Dec 2023, not yet issued
300 Grant Av1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms.
Details
Permit
202312132413
Status
filed
Filed
Dec 13, 2023
Declared cost
$200,000
Address
300 Grant Av

1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms.

Open the permit page

$200,000
Nov 15, 2023Completed
final sign-off Feb 2025
300 Grant AvKukbo Design Usa Llc5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred)
Details
Permit
202311150842
Status
complete
Filed
Nov 15, 2023
Permit issued
Jun 13, 2024
Final sign-off
Feb 11, 2025
Declared cost
$1,200,000
Address
300 Grant Av

5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred)

Open the permit page

$1,200,000
Oct 5, 2023Never finaled
filed Oct 2023, never issued
300 Grant Avdemo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits)
Details
Permit
202310058079
Status
filed
Filed
Oct 5, 2023
Declared cost
$5,000
Address
300 Grant Av

demo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits)

Open the permit page

$5,000
Jul 27, 2023Never finaled
filed Jul 2023, never issued
300 Grant Avbasement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flr
Details
Permit
202307273116
Status
filed
Filed
Jul 27, 2023
Declared cost
$800,000
Address
300 Grant Av

basement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flr

Open the permit page

$800,000
Apr 19, 2023Completed
final sign-off Jun 2023
300 Grant Av4th flr - generate new meeting rooms (3): new two small meeting room. modify existing to accomodate one meeting room. install new partition wall, ceiling, recessed light (with dimmer switch). mep deferred and sprinkler/fire alarm permit will be processed separately. ref 201612275920"s".
Details
Permit
202304196033
Status
complete
Filed
Apr 19, 2023
Permit issued
May 8, 2023
Final sign-off
Jun 23, 2023
Declared cost
$50,000
Address
300 Grant Av

4th flr - generate new meeting rooms (3): new two small meeting room. modify existing to accomodate one meeting room. install new partition wall, ceiling, recessed light (with dimmer switch). mep deferred and sprinkler/fire alarm permit will be processed separately. ref 201612275920"s".

Open the permit page

$50,000
Apr 3, 2023Completed
final sign-off Apr 2023
300 Grant Avinstall (n) interior panels to reception area over (e) non-rated interior partition wall
Details
Permit
202304034905
Status
complete
Filed
Apr 3, 2023
Permit issued
Apr 3, 2023
Final sign-off
Apr 20, 2023
Declared cost
$5,000
Address
300 Grant Av

install (n) interior panels to reception area over (e) non-rated interior partition wall

Open the permit page

$5,000
Mar 1, 2023Completed
final sign-off Apr 2023
300 Grant Av4th fl - extend (e) wall to the ceiling (vertically); extend 9 ft height wall to 11'-9 height wall; (e) elevation to remain; there is no electrical work. sprinkler and mep permit will be filed separately
Details
Permit
202303012831
Status
complete
Filed
Mar 1, 2023
Permit issued
Mar 7, 2023
Final sign-off
Apr 20, 2023
Declared cost
$10,000
Address
300 Grant Av

4th fl - extend (e) wall to the ceiling (vertically); extend 9 ft height wall to 11'-9 height wall; (e) elevation to remain; there is no electrical work. sprinkler and mep permit will be filed separately

Open the permit page

$10,000
Feb 21, 2023Completed
final sign-off Apr 2023
300 Grant Av4/f: generate new private office, install new partition wall, new drywall ceiling, install 6 recessed lights on ceiling w/ 2 dimmer switches, install 1 track lighting on ceiling w/ 1 dimmer switch - all work on the 4th floor. sprinkler/mep will be filed separately.
Details
Permit
202302212296
Status
complete
Filed
Feb 21, 2023
Permit issued
Mar 1, 2023
Final sign-off
Apr 11, 2023
Declared cost
$30,000
Address
300 Grant Av

4/f: generate new private office, install new partition wall, new drywall ceiling, install 6 recessed lights on ceiling w/ 2 dimmer switches, install 1 track lighting on ceiling w/ 1 dimmer switch - all work on the 4th floor. sprinkler/mep will be filed separately.

Open the permit page

$30,000
Feb 6, 2023Completed
final sign-off Apr 2023
300 Grant Avinstall (n) non-electric double face banner sign.
Details
Permit
202302061471
Status
complete
Filed
Feb 6, 2023
Permit issued
Mar 31, 2023
Final sign-off
Apr 20, 2023
Declared cost
$10,000
Address
300 Grant Av

install (n) non-electric double face banner sign.

Open the permit page

$10,000
Jan 9, 2023Never finaled
filed Jan 2023, never issued
300 Grant Avinstall new stair case from basement floor to 2nd floor. new (2) bathrooms on the 1st floor.
Details
Permit
202301099843
Status
approved
Filed
Jan 9, 2023
Declared cost
$150,000
Address
300 Grant Av

install new stair case from basement floor to 2nd floor. new (2) bathrooms on the 1st floor.

Open the permit page

$150,000
Aug 4, 2022Completed
final sign-off Sep 2022
300 Grant Av4/f: new non-structural partitions and finishes, new painting, lighting and electrical throughtout.
Details
Permit
202208049940
Status
complete
Filed
Aug 4, 2022
Permit issued
Aug 12, 2022
Final sign-off
Sep 20, 2022
Declared cost
$14,000
Address
300 Grant Av

4/f: new non-structural partitions and finishes, new painting, lighting and electrical throughtout.

Open the permit page

$14,000