Jiwon Jung
- Listed as
- engineer
- On San Francisco permits
- Aug 2022 to Sep 2024
13 permits since 2000 (engineer on 13 permits): 8 completed, 2 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 5, 2024 | In progress filed Sep 2024, not yet issued | 300 Grant Av | new ramp addition for retail space. apply new wall finishes. no exterior (facade) workDetails
new ramp addition for retail space. apply new wall finishes. no exterior (facade) work | $75,000 | |
| Jan 31, 2024 | Completed final sign-off Feb 2025 | 300 Grant Av | Kukbo Design Usa Llc | 5/f:deferred submittal of mechanical, electrical & plumbing work only. ref ti pa# 202311150842.Details
5/f:deferred submittal of mechanical, electrical & plumbing work only. ref ti pa# 202311150842. | $600,000 |
| Dec 13, 2023 | In progress filed Dec 2023, not yet issued | 300 Grant Av | 1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms.Details
1/f: ti office, mep per for new retail, lobby, staircase and toilet rooms. | $200,000 | |
| Nov 15, 2023 | Completed final sign-off Feb 2025 | 300 Grant Av | Kukbo Design Usa Llc | 5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred)Details
5th fl tenant improvement (office). generate new office, conference rooms, pantry, lounges, and bathrooms. (fire sprinkler, alarm and mep deferred) | $1,200,000 |
| Oct 5, 2023 | Never finaled filed Oct 2023, never issued | 300 Grant Av | demo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits)Details
demo existin tenant interior fixtures on the 1st flr, re-route mep pipes from basement to the 2nd flr. b/f, !/f & 2/f are fully vacant (separate ti permits) | $5,000 | |
| Jul 27, 2023 | Never finaled filed Jul 2023, never issued | 300 Grant Av | basement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flrDetails
basement, 1st & 2nd flr: tenant improvement- creating lobby space on 1st flr,new stair case from basement to 2nd flr with floor opening, 2-new bathrooms on the 1st flr | $800,000 | |
| Apr 19, 2023 | Completed final sign-off Jun 2023 | 300 Grant Av | 4th flr - generate new meeting rooms (3): new two small meeting room. modify existing to accomodate one meeting room. install new partition wall, ceiling, recessed light (with dimmer switch). mep deferred and sprinkler/fire alarm permit will be processed separately. ref 201612275920"s".Details
4th flr - generate new meeting rooms (3): new two small meeting room. modify existing to accomodate one meeting room. install new partition wall, ceiling, recessed light (with dimmer switch). mep deferred and sprinkler/fire alarm permit will be processed separately. ref 201612275920"s". | $50,000 | |
| Apr 3, 2023 | Completed final sign-off Apr 2023 | 300 Grant Av | install (n) interior panels to reception area over (e) non-rated interior partition wallDetails
install (n) interior panels to reception area over (e) non-rated interior partition wall | $5,000 | |
| Mar 1, 2023 | Completed final sign-off Apr 2023 | 300 Grant Av | 4th fl - extend (e) wall to the ceiling (vertically); extend 9 ft height wall to 11'-9 height wall; (e) elevation to remain; there is no electrical work. sprinkler and mep permit will be filed separatelyDetails
4th fl - extend (e) wall to the ceiling (vertically); extend 9 ft height wall to 11'-9 height wall; (e) elevation to remain; there is no electrical work. sprinkler and mep permit will be filed separately | $10,000 | |
| Feb 21, 2023 | Completed final sign-off Apr 2023 | 300 Grant Av | 4/f: generate new private office, install new partition wall, new drywall ceiling, install 6 recessed lights on ceiling w/ 2 dimmer switches, install 1 track lighting on ceiling w/ 1 dimmer switch - all work on the 4th floor. sprinkler/mep will be filed separately.Details
4/f: generate new private office, install new partition wall, new drywall ceiling, install 6 recessed lights on ceiling w/ 2 dimmer switches, install 1 track lighting on ceiling w/ 1 dimmer switch - all work on the 4th floor. sprinkler/mep will be filed separately. | $30,000 | |
| Feb 6, 2023 | Completed final sign-off Apr 2023 | 300 Grant Av | install (n) non-electric double face banner sign.Details
install (n) non-electric double face banner sign. | $10,000 | |
| Jan 9, 2023 | Never finaled filed Jan 2023, never issued | 300 Grant Av | install new stair case from basement floor to 2nd floor. new (2) bathrooms on the 1st floor.Details
install new stair case from basement floor to 2nd floor. new (2) bathrooms on the 1st floor. | $150,000 | |
| Aug 4, 2022 | Completed final sign-off Sep 2022 | 300 Grant Av | 4/f: new non-structural partitions and finishes, new painting, lighting and electrical throughtout.Details
4/f: new non-structural partitions and finishes, new painting, lighting and electrical throughtout. | $14,000 |