Charles Davis
- License
- C4274
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Ehdd Architects
- On San Francisco permits
- May 2006 to Jun 2012
4 permits since 2000 (architect on 4 permits): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Michael Gaul General Contractors (2), Peacock Construction Inc
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2012 | Completed final sign-off Aug 2013 | 3180 18th St | Peacock Construction Inc | interior refurbishment of bldg corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. no structural work, deferred submittals for mechanical, electrical including lighting, fire/life safety).Details
interior refurbishment of bldg corridors, 2nd floor restrooms, & one tenant suite on the 2nd floor. scope includes new-non-rated partitoins, lighting, restroom fixtures, & interior finishes. no structural work, deferred submittals for mechanical, electrical including lighting, fire/life safety). | $300,000 |
| Jul 7, 2011 | Completed final sign-off Dec 2011 | 2615 Divisadero St | Michael Gaul General Contractors | revision to pa #201004301513: additional work to (e) permit. interior wall removal. kitchen remodelDetails
revision to pa #201004301513: additional work to (e) permit. interior wall removal. kitchen remodel | $70,000 |
| Aug 23, 2006 | Completed final sign-off Jun 2007 | 2615 Divisadero St | Michael Gaul General Contractors | removable roof deck installed over (e) flat roof with new access door. remodel (e) bathroom. flourescent light in bath, other lights controlled by o.s.Details
removable roof deck installed over (e) flat roof with new access door. remodel (e) bathroom. flourescent light in bath, other lights controlled by o.s. | $65,000 |
| May 8, 2006 | Never finaled issued May 2006, no final | 2048 Leavenworth St | interior remodel including kchn, bathroom, laundry, and library. replacement of 2 wndws and 1 pair exterior doors and not visible from street for both door and wndw replacementDetails
interior remodel including kchn, bathroom, laundry, and library. replacement of 2 wndws and 1 pair exterior doors and not visible from street for both door and wndw replacement | $300,000 |