Permit GraphShortlistSan Francisco building permits since 2000

Jesse Landers

License
C83060
Civil engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up C83060 at the Board for Professional Engineers
Listed as
engineer
Firm
Design Everest
Based in
Mountain View
On San Francisco permits
Sep 2018 to Oct 2024

5 permits since 2000 (engineer on 5 permits): 4 completed, 1 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
D Construction Inc (3)
Architects
Erik S Chan (3), David Clayton
Engineers
Patrick Bird

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 3, 2024Completed
final sign-off Apr 2025
875 36th AvD Construction Increvision to pa # 2022-0526-5039 structural changes. architectural changes; existing kitchen window at 2nd & 3rd fl kitchens to remain
Details
Permit
202410032256
Permit issued
Oct 11, 2024
Final sign-off
Apr 9, 2025

revision to pa # 2022-0526-5039 structural changes. architectural changes; existing kitchen window at 2nd & 3rd fl kitchens to remain

Open the permit page

Jan 27, 2023Never finaled
filed Jan 2023, never issued
1871 15th Avto erect a 1-story, 1-adu structure at the rear. type v-b.
Details
Permit
202301270923

to erect a 1-story, 1-adu structure at the rear. type v-b.

Open the permit page

$100,000
May 26, 2022Completed
final sign-off May 2025
875 36th AvD Construction Inclegalize (e) non-permitted ground floor unit per state adu program change of occupancy r-3 to r-2. unit will be added per government code section 65852.2 for the state adu program.
Details
Permit
202205265050
Permit issued
Jan 24, 2025
Final sign-off
May 1, 2025

legalize (e) non-permitted ground floor unit per state adu program change of occupancy r-3 to r-2. unit will be added per government code section 65852.2 for the state adu program.

Open the permit page

$20,785
May 26, 2022Completed
final sign-off Apr 2025
875 36th AvD Construction Incinterior remodel to (e) 3-story, 2-family dwelling. kitchen and bath remodel to 2nd & 3rd floors. new bathroom to 2nd & 3rd floor units. adu under separate pa#202205265050.
Details
Permit
202205265039
Permit issued
May 9, 2024
Final sign-off
Apr 9, 2025

interior remodel to (e) 3-story, 2-family dwelling. kitchen and bath remodel to 2nd & 3rd floors. new bathroom to 2nd & 3rd floor units. adu under separate pa#202205265050.

Open the permit page

$128,108
Sep 6, 2018Completed
final sign-off Apr 2019
787 39th Avstructural replace beam in basement to support extg beam. 2nd floor ref app#201807164669
Details
Permit
201809069255
Permit issued
Oct 16, 2018
Final sign-off
Apr 24, 2019

structural replace beam in basement to support extg beam. 2nd floor ref app#201807164669

Open the permit page

$10,000