Jeffrey Trieb
- License
- 34813
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Casco
- On San Francisco permits
- Mar 2017 to Feb 2019
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Kopplin Construction Company, Midland General Contractors Inc.
- Architects
- Caron Stevenson (2)
- Engineers
- Joseph Carter (2), Daniel Cutter
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2019 | Completed final sign-off Dec 2020 | 3322 Fillmore St | Kopplin Construction Company | interior ti to (e) lease space for a boxing fitness studio. work includes partitions, ceiling, restrooms, mep work. change of use from m to a-3, determin occupant load.Details
interior ti to (e) lease space for a boxing fitness studio. work includes partitions, ceiling, restrooms, mep work. change of use from m to a-3, determin occupant load. | $1,700,000 |
| Mar 15, 2017 | Completed final sign-off Nov 2017 | 2131 Irving St | Midland General Contractors Inc. | interior ti to existing retail space for new outpaitient clinic used to provide care on less than a 24 hr basis to persons not rendered incapable of self preservation. no exterior work other than rtu c/oDetails
interior ti to existing retail space for new outpaitient clinic used to provide care on less than a 24 hr basis to persons not rendered incapable of self preservation. no exterior work other than rtu c/o | $500,000 |