Jeff Kroot Arch.
- License
- C7363
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- J & K Assoc.
- Based in
- San Anselmo
- On San Francisco permits
- Jun 2005 to May 2023
6 permits since 2000 (architect on 6 permits): 3 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Structural Integrity (3), Steve Dudum Construction
- Engineers
- Mehdi Khrim (2), Michael G. Watkins
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Never finaled issued Jun 2023, no final | 3526 Anza St | Structural Integrity | revision to pa# 202209011769. changes include removing entry door by garage. removing interior wall. moving some mechanical to roof, and other minor changes.Details
revision to pa# 202209011769. changes include removing entry door by garage. removing interior wall. moving some mechanical to roof, and other minor changes. | |
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 3526 Anza St | Structural Integrity | remodel e bathroom, same number of fixtures, new tile, window, toilet, vanity, fan, etcDetails
remodel e bathroom, same number of fixtures, new tile, window, toilet, vanity, fan, etc | $15,000 |
| Sep 1, 2022 | Completed final sign-off Nov 2023 | 3526 Anza St | Structural Integrity | remodel of lower floor garage into an adu.per ordinance 95-17.Details
remodel of lower floor garage into an adu.per ordinance 95-17. | $100,000 |
| Oct 30, 2018 | Completed final sign-off Jun 2019 | 1027 Hayes St | unit#3 remodel kitchen, bath & closet. relocate gas heater.Details
unit#3 remodel kitchen, bath & closet. relocate gas heater. | $100,000 | |
| Apr 30, 2014 | Never finaled issued Apr 2014, no final | 428 Wawona St | revision to 201403140789. to add walls at gr fl recreation room to create storage roomDetails
revision to 201403140789. to add walls at gr fl recreation room to create storage room | $3,000 | |
| Jun 7, 2005 | Completed final sign-off Mar 2006 | 1831 Fulton St | Steve Dudum Construction | build out of back 1/3 rd of garage to worksitop and dance/yoga studio with added bath.Details
build out of back 1/3 rd of garage to worksitop and dance/yoga studio with added bath. | $25,000 |