Jason Page
- License
- 62132
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Spi Consulting Engineers Inc
- Based in
- Lafayette
- On San Francisco permits
- May 2025 to May 2025
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bryan J. Valverde Co, Cahill Guzman Construction Group Jv
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2025 | Completed final sign-off May 2026 | 160 Freelon St | Cahill Guzman Construction Group Jv | temporary excavation shoring system for proposed h-story residential bldg at 160 freelon st. the excavation with typical retained heights up to 5-feet are shored using cantilevered soldier piles and timber lagging. ref pa# 202209283327.Details
temporary excavation shoring system for proposed h-story residential bldg at 160 freelon st. the excavation with typical retained heights up to 5-feet are shored using cantilevered soldier piles and timber lagging. ref pa# 202209283327. | $150,000 |
| May 7, 2025 | Expired or cancelled withdrawn May 2025 | 1015 Francisco St | Bryan J. Valverde Co | unit #3: rev to pa# 2025-0214-0372 to combine 6 windows into 3 includes engineering calculations for the windows wall removal in pantry 2 pocket door to downstairs and new post at fireplaceDetails
unit #3: rev to pa# 2025-0214-0372 to combine 6 windows into 3 includes engineering calculations for the windows wall removal in pantry 2 pocket door to downstairs and new post at fireplace | $11,000 |