Jason Ceglia
- Listed as
- engineer
- On San Francisco permits
- May 2022 to Oct 2022
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2022 | Completed final sign-off Feb 2023 | 20 Heron St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | modification to (e) verizon electrical system to meet additional power requirements.Details
modification to (e) verizon electrical system to meet additional power requirements. | $5,000 |
| May 26, 2022 | Completed final sign-off Apr 2025 | 1050 Sansome St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | verizon - remove (e) 25 kw diesel generator w/tank & replace w (n) genrac sd050 2/52 gallon tank; relocate (e) emergency shutoffDetails
verizon - remove (e) 25 kw diesel generator w/tank & replace w (n) genrac sd050 2/52 gallon tank; relocate (e) emergency shutoff | $87,000 |