Jamie Freeman Greene
- License
- C87593
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C87593 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Sep 2026 to Nov 2026
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Momentum Construction & Development Llc
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 119 Buena Vista Tr | repair (e) dry rot damaged balcony joists in kind with pressure treated lumber. maintain (e) balcony configuration, finished elevations, and decking. no proposed change to overall exterior architectural appearance. balcony on floor 3.Details
repair (e) dry rot damaged balcony joists in kind with pressure treated lumber. maintain (e) balcony configuration, finished elevations, and decking. no proposed change to overall exterior architectural appearance. balcony on floor 3. | $25,000 | |
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 1821 21st Av | Momentum Construction & Development Llc | front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance...Details
front stair replacement: reconstruction (e) damaged front staircase in kind w/ timber framing, maintain (e) location, configuration, overall dimensions, riser/tread arrangement, and finished elevations. provide new stone exterior stone tile finish similar to (e) in general appearance... | $15,000 |
| Sep 25, 2026 | In progress issued Sep 2026 | 1049 Clay St | replace in kind (e) roof deck with timbertech decking and viewrail cable guardrail system.Details
replace in kind (e) roof deck with timbertech decking and viewrail cable guardrail system. | $70,000 |