James Patrick Hakes
- License
- C31315
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jun 2026 to Jun 2026
3 permits since 2000 (architect on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 518 Walnut St | ed17-02 priority: erect type 1a 5 story residential, 3 basement 64 residential unit mix-use bldg.Details
ed17-02 priority: erect type 1a 5 story residential, 3 basement 64 residential unit mix-use bldg. | $71,000,000 | |
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 3333 California St | ed17-02 priority:(center a) part of phase 2 consist of alteration/addition (e) structure into 2 bldgs. center a is 6-story residential over 1 level basement w/ 44 resi units. level 1 contains residential amenities & level b1 contains utilities & connection to walnut bldg garage.Details
ed17-02 priority:(center a) part of phase 2 consist of alteration/addition (e) structure into 2 bldgs. center a is 6-story residential over 1 level basement w/ 44 resi units. level 1 contains residential amenities & level b1 contains utilities & connection to walnut bldg garage. | $35,000,000 | |
| Jun 12, 2026 | In progress filed Jun 2026, not yet issued | 3333 California St | ed17-02 priority:(center b) part of phase 2 consist of alteration/addition (e) structure into 2 bldgs. center b is 8-story residential over 2 level basement w/ 92 resi units. level 1 & b2 contains residential amenities & b3 contains theDetails
ed17-02 priority:(center b) part of phase 2 consist of alteration/addition (e) structure into 2 bldgs. center b is 8-story residential over 2 level basement w/ 92 resi units. level 1 & b2 contains residential amenities & b3 contains the | $90,000,000 |