Twen Ma
- License
- C16815
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Team Metric
- Based in
- San Jose
- On San Francisco permits
- Oct 2023 to Apr 2025
4 permits since 2000 (architect on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ray Foundation Construction Inc (2), Team Metric Construction Corporation (2), Y & K Inc (2)
- Architects
- Krishna Kumar
- Engineers
- Francis Malkham (2), Jin Qing Li, Krishna Kumar
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2025 | In progress issued May 2025 | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | revision to pa #2023-1017-8770 redesign the layout for 4th fl. expand the (e) deck in 2nd fl from 5'1" to 5'1" x 10-4". eliminate fire place on 2nd fl. update foundation plan, 1st fl framing plan & 2nd fl framing plan. new skylightsDetails
revision to pa #2023-1017-8770 redesign the layout for 4th fl. expand the (e) deck in 2nd fl from 5'1" to 5'1" x 10-4". eliminate fire place on 2nd fl. update foundation plan, 1st fl framing plan & 2nd fl framing plan. new skylights | |
| Apr 4, 2025 | Completed final sign-off May 2026 | 722 17th Av | Ray Foundation Construction Inc | change engineer on record, minor change to foundation plan revision to pa#2023-1211-2259 to upgrade fodundation detail to adress the nov#202535074.Details
change engineer on record, minor change to foundation plan revision to pa#2023-1211-2259 to upgrade fodundation detail to adress the nov#202535074. | $2,000 |
| Jul 25, 2024 | Completed final sign-off Jun 2026 | 722 17th Av | Ray Foundation Construction Inc | remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater.Details
remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater. | $290,000 |
| Oct 17, 2023 | In progress issued Jan 2025 | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec.Details
legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec. | $900,000 |