James Heron
- Listed as
- architect, authorized agent-others, engineer
- Firm
- James Heron Architect
- Based in
- San Francisco
- On San Francisco permits
- Feb 2004 to Aug 2015
30 permits since 2000 (architect on 28 permits, authorized agent-others on 1 permit, engineer on 1 permit): 24 completed, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2015 | Completed final sign-off Jun 2016 | 2646 21st Av | B Construction | interior remodel. ground level, new media room, new bedroom, new bath. new 1 hr wall at garage. no changes to 2nd levelDetails
interior remodel. ground level, new media room, new bedroom, new bath. new 1 hr wall at garage. no changes to 2nd level | $35,000 |
| Jul 17, 2015 | Never finaled issued Dec 2016, no final | 207 Duncan St | Kenny Gong Construction | rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath.Details
rear yard addition & remodel: garage level; relocate interior stair, new media rm w/ half bath, remodel (e) bath. 2nd fl; relocate interior stair, new family rm, kitchen addition w/ deck, remodel (e) bed & bath. | $225,000 |
| Jun 2, 2015 | Completed final sign-off Jun 2015 | 4241 23rd St | Luke Gilligan Inc. | revision appl. 2014.1027.9928. clarification of 1-hr ceiling assembly.Details
revision appl. 2014.1027.9928. clarification of 1-hr ceiling assembly. | |
| Dec 27, 2013 | Never finaled issued Mar 2014, no final | 1002 Clayton St | at rear add 4 (n) windows & 1 (n) door. minor fill-in under (e) kitchen. first fl (n) habitable media rm/work out w/ (n) one bathrm. 2nd level open (e) stair to garage level. front: enlarge garage door from 7' to 8' salvage (e) brick.Details
at rear add 4 (n) windows & 1 (n) door. minor fill-in under (e) kitchen. first fl (n) habitable media rm/work out w/ (n) one bathrm. 2nd level open (e) stair to garage level. front: enlarge garage door from 7' to 8' salvage (e) brick. | $45,000 | |
| Dec 3, 2013 | Completed final sign-off Aug 2016 | 4015 26th St | 3 story horizontal rear yard addition & remodel: 1st flr add media rm, den, bath, 2nd flr. add family rm & 1/2 bath; 3rd flr. enlarge bedroom add bathroom. deck at 2nd & 3rd level. court at 2nd level & remodel kitchen. open stair to garage.Details
3 story horizontal rear yard addition & remodel: 1st flr add media rm, den, bath, 2nd flr. add family rm & 1/2 bath; 3rd flr. enlarge bedroom add bathroom. deck at 2nd & 3rd level. court at 2nd level & remodel kitchen. open stair to garage. | $175,000 | |
| May 3, 2013 | Completed final sign-off Jul 2013 | 4671 18th St | re-build foundation support wall at (e) front stairs in kind. replace (e) rail in kind. re-install (e) terrazzo treadsDetails
re-build foundation support wall at (e) front stairs in kind. replace (e) rail in kind. re-install (e) terrazzo treads | $3,500 | |
| Mar 1, 2013 | Completed final sign-off Feb 2014 | 628 16th Av | Barker-O'donoghue Master Bldrs | revision to pa# 2011-0825-3208-structural only-no chnages to mechanical or electrical. reduction in scope to save costs, eliminate structural work at garage area & ground level bay. replace garage doorDetails
revision to pa# 2011-0825-3208-structural only-no chnages to mechanical or electrical. reduction in scope to save costs, eliminate structural work at garage area & ground level bay. replace garage door | |
| Aug 25, 2011 | Completed final sign-off Feb 2014 | 628 16th Av | 3 story horizontal addition at rear & interior remodel, new media rm at basement (w bath), new interior stair, kitchen remodel. reconfigure bedrm, bath at 3rd floor. new bathroom closet at penthouse.Details
3 story horizontal addition at rear & interior remodel, new media rm at basement (w bath), new interior stair, kitchen remodel. reconfigure bedrm, bath at 3rd floor. new bathroom closet at penthouse. | $175,000 | |
| Jul 15, 2011 | Completed final sign-off Feb 2012 | 16 Heather Av | Mc Gee & Mc Gee Construction Corp | interior remodel, non structural, upper unit kitchen and bath remodel. new habitable exercise room and bathroom at garage level. foundation boltingDetails
interior remodel, non structural, upper unit kitchen and bath remodel. new habitable exercise room and bathroom at garage level. foundation bolting | $55,000 |
| May 26, 2011 | Completed final sign-off Jun 2013 | 4671 18th St | rear yard 3 story addition. rebuild rear deck & stairs. new habitable space at garage level. remodel both units kitchens and baths.Details
rear yard 3 story addition. rebuild rear deck & stairs. new habitable space at garage level. remodel both units kitchens and baths. | $175,000 | |
| Mar 10, 2011 | Completed final sign-off Dec 2011 | 4470 23rd St | renovate front facade, rebuild front stairs, add new windows at front (net 45.5 sq ft). remodel bathroom & kitchen of upper unit in kindDetails
renovate front facade, rebuild front stairs, add new windows at front (net 45.5 sq ft). remodel bathroom & kitchen of upper unit in kind | $28,000 | |
| Jan 6, 2011 | Completed final sign-off May 2012 | 1720 Sanchez St | revision to app #201006084110 & 201011245636. infill floor above garage.Details
revision to app #201006084110 & 201011245636. infill floor above garage. | $2,000 | |
| Dec 6, 2010 | Completed final sign-off May 2011 | 2471 25th Av | Gerard Keightley Construction Inc | ground floor - existing den, family room & bathroom to be legalized. reconfigure existing interior stair to access existing conditioned space. provide new 20 min. door between garage & stair.Details
ground floor - existing den, family room & bathroom to be legalized. reconfigure existing interior stair to access existing conditioned space. provide new 20 min. door between garage & stair. | $8,500 |
| Nov 24, 2010 | Completed final sign-off May 2012 | 1720 Sanchez St | rev. to pa# 2010.06.08.4110. revise sheet s1.1 for retaining wall repalcement at rear patio, square off retaining wall , and garage beam revision to delete post.Details
rev. to pa# 2010.06.08.4110. revise sheet s1.1 for retaining wall repalcement at rear patio, square off retaining wall , and garage beam revision to delete post. | $100 | |
| Jul 13, 2010 | Expired or cancelled expired Dec 2018 | 466 27th St | rear addition (2 story & garage). no changes to front facade. raise plate height @ rear roof cridge to match existing. interior remodel.Details
rear addition (2 story & garage). no changes to front facade. raise plate height @ rear roof cridge to match existing. interior remodel. | $195,000 | |
| Aug 7, 2008 | Completed final sign-off May 2010 | 124 Chenery St | revision to application 200803177306, revise 1st & 2nd floor, bathroom & closet, relocate shear wall on 1st floor. electrical & plumbing under separate permit.Details
revision to application 200803177306, revise 1st & 2nd floor, bathroom & closet, relocate shear wall on 1st floor. electrical & plumbing under separate permit. | ||
| Jun 26, 2008 | Completed final sign-off Mar 2013 | 1730 Sanchez St | Luke Gilligan Inc. | raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deckDetails
raise roof at (e) attic, add dormers. rear yard addition. modify facade. new kitchen, 1/2 bath and family at 2nd level. new habitable space at garage level. new bathrooms at attic level. seismic upgrade, rear roof deck | $270,000 |
| May 13, 2008 | Completed final sign-off Jun 2013 | 87 Banks St | raise (e) building 4', build new garage under and add 3rd level above with 2 bedrooms/2 baths. redo (e) kitchen and add 1/2 bath at main level. new office at garage level with 1/2 bath. new windows to be wood.Details
raise (e) building 4', build new garage under and add 3rd level above with 2 bedrooms/2 baths. redo (e) kitchen and add 1/2 bath at main level. new office at garage level with 1/2 bath. new windows to be wood. | $275,000 | |
| Apr 11, 2008 | Completed final sign-off May 2009 | 287 Brentwood Av | add bay window at kitchen. remodel kitchen, bathrooms, enlarge interior stairs, remodel & expand habitable space at 1st level to new bathroom and gymDetails
add bay window at kitchen. remodel kitchen, bathrooms, enlarge interior stairs, remodel & expand habitable space at 1st level to new bathroom and gym | $95,000 | |
| Mar 17, 2008 | Completed final sign-off Dec 2009 | 124 Chenery St | unit #124- interior remodel plus ground level garage area for 2 full bath rooms, 2 bedrooms, and enlarge garage door.connect to 2nd level. this is not a seismic upgrade.Details
unit #124- interior remodel plus ground level garage area for 2 full bath rooms, 2 bedrooms, and enlarge garage door.connect to 2nd level. this is not a seismic upgrade. | $160,000 | |
| Jan 19, 2007 | Completed final sign-off Nov 2007 | 203 Fairmount St | interior remodel-minor fill in at rear. replace windows with wood.Details
interior remodel-minor fill in at rear. replace windows with wood. | $95,000 | |
| Jun 16, 2006 | Expired or cancelled expired Mar 2009 | 955 Grove St | add three new roof dormers at top floor.Details
add three new roof dormers at top floor. | $20,000 | |
| Jun 9, 2006 | Expired or cancelled expired Mar 2007 | 3881 Cesar Chavez St | Trejo's Design | remove extg brick foundtion, replac with concrete foundation/revision to app #200502155554Details
remove extg brick foundtion, replac with concrete foundation/revision to app #200502155554 | $15,000 |
| May 25, 2006 | Completed final sign-off Jun 2008 | 1382 06th Av | Nevin Construction Inc. | 2 story rear yard addition.Details
2 story rear yard addition. | $125,000 |
| May 10, 2006 | Completed final sign-off Mar 2007 | 454 Scott St | Gerard Keightley Construction Inc | interior remodel including structural upgrade.relocate partitions. interior stair to garage from lower unit. remove exterior mineral siding. all new wood windows. repair /replace facade trim & mouldings. minor 20 sf. "fill in" at rear (lower unit). (foundations & kitchens/baths under separ permits.Details
interior remodel including structural upgrade.relocate partitions. interior stair to garage from lower unit. remove exterior mineral siding. all new wood windows. repair /replace facade trim & mouldings. minor 20 sf. "fill in" at rear (lower unit). (foundations & kitchens/baths under separ permits. | $100,000 |
| Dec 23, 2005 | Completed final sign-off Sep 2008 | 931 Elizabeth St | one story vertical addition.front&side yard addition. interior remodel. ground floor excavation and foundation upgrade.Details
one story vertical addition.front&side yard addition. interior remodel. ground floor excavation and foundation upgrade. | $250,000 | |
| Jun 23, 2005 | Completed final sign-off Jul 2005 | 3720 21st St | new fence stucco and patio rebuild.Details
new fence stucco and patio rebuild. | $4,000 | |
| Feb 24, 2005 | Completed final sign-off Mar 2006 | 21 Homestead St | Luke Gilligan Inc. | kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad woodDetails
kitchens and bathrm remodel new finished attic new parking lift facade remodel (n) dormers clad wood | $150,000 |
| Feb 15, 2005 | Expired or cancelled expired Mar 2007 | 3881 Cesar Chavez St | Trejo's Design | interior remodel-garage lvl & 2nd lvl kitchen.fill in under (e)family rm facade remodel @ front.Details
interior remodel-garage lvl & 2nd lvl kitchen.fill in under (e)family rm facade remodel @ front. | $75,000 |
| Feb 26, 2004 | Completed final sign-off Oct 2004 | 3970 22nd St | rebuild (e) entry at side yard. increase size of entry by 12.5 sfDetails
rebuild (e) entry at side yard. increase size of entry by 12.5 sf | $16,000 |